SECTION 12.0 UNIFORM CONSTRUCTION FILING SYSTEM<br />

TABLE 12-1<br />

Project Filing Index<br />

File Number<br />

PLN<br />

File Name<br />

Start-up, Plans<br />

TRN Start-up, Training,<br />

SUL Submittals Log<br />

COT Testing, Concrete<br />

CPQ Testing, C-P/DPW-QA/QC: (lab and field tests)<br />

EQT Testing, Equipment<br />

OTT Testing, Other<br />

SOT Testing, Soil<br />

12 Project Close-out<br />

ACF Acceptance Certification, Final<br />

ABD As-built Drawings<br />

FIS Final Inspection<br />

PCR Reports, Project Close-out<br />

FCR Reports, Final Construction<br />

FER Reports, Final Engineering<br />

13 Collaborative Tools<br />

RFIs<br />

Submittals<br />

Daily Reports<br />

Photos<br />

12-4 GNV310133632155.DOC/090840001