SECTION 9.0 CONSTRUCTION QA/QC PROGRAM<br />

<br />

<br />

<br />

Required certificates of conformance and tests, certified analyses, and laboratory tests<br />

have been submitted.<br />

Warranties, tools and equipment, and O&M manuals are approved and available.<br />

All applicable Notices of Non-Conformance have been released.<br />

10.2.4 Results<br />

If deficiencies are noted at the completion of the substantial completion inspection, the<br />

Project Construction Manager, Field Inspector and Design Engineer will prepare a punchlist<br />

using C-P/DPW Form 021 “Final Inspection/Project Closeout Process” as a guide to<br />

identify deficiencies found during the inspection. This document will be signed by both the<br />

Project Construction Manager and the Contractor.<br />

If the work is found to be substantially complete, the Project Construction Manager will<br />

prepare a Letter of Conditional Approval for signature by the Program Construction<br />

Manager and the Contractor.<br />

10.3 Final Completion Inspection<br />

10.3.1 Final Completion<br />

Final completion occurs on the date certified by the Project Construction Manager or in<br />

accordance with the Contract Documents. The final completion inspection includes both<br />

physical examination of the work and the examination of contract provisions and<br />

requirements to establish the Contract has been fully performed.<br />

10.3.2 Inspection Participants<br />

Those participants identified for the substantial completion inspection will be invited to<br />

attend and participate in the final completion inspection.<br />

10.3.3 Final Completion Guidelines<br />

Guidelines regarding the final completion inspection include the following:<br />

<br />

<br />

<br />

<br />

<br />

<br />

Contractor requests Project Construction Manager conduct a final completion<br />

inspection.<br />

If Project Construction Manager finds conditions satisfied, they then notify the<br />

participants identified in paragraph 9.2.2 of the time and place of the final inspection.<br />

During the final inspection, parties will inspect the work and examine applicable<br />

portions of the Contract Documents.<br />

If the inspection is not satisfactory, Project Construction Manager will prepare a final<br />

punchlist.<br />

Contractor will correct items noted on the final punchlist.<br />

If the inspection is satisfactory, the Program Construction Manager will authorize<br />

issuance of the Notice of Final Completion. At that point, Senior Construction Specialist<br />

then prepares a memorandum to the C-P/DPW stating that punchlist items have been<br />

successfully completed and to recommend issuance of Final Acceptance.<br />

10-2 GNV310133632155.DOC/090840001