SECTION 2.0.PROGRAM DESCRIPTION<br />

TABLE 2-1<br />

Reservoir Storage and Repumping Projects<br />

Location<br />

Storage Volume<br />

Choctaw Drive<br />

Hooper Road<br />

South WWTP<br />

24 MG<br />

10 MG<br />

64 MG<br />

The wet weather treatment capacity of the South WWTP will be expanded to accommodate<br />

the predicted peak flow of 200 million gallons per day (mgd) after peak shaving storage.<br />

In addition to the wet weather improvement and storage projects, three immediate action<br />

projects will be undertaken at the South WWTP. The purpose of those projects is to assist<br />

the plant in complying with Consent Decree discharge limits. These projects are described in<br />

this report.<br />

The South WWTP immediate action projects’ design work started in 2007 with construction<br />

schedule to begin in 2009. The South WWTP wet weather projects and the Choctaw storage<br />

projects will start design in 2008 with construction proceeding in 2009. The Hooper Road<br />

storage project is scheduled in subsequent years. Project budget for wastewater treatment<br />

and storage projects is $299.8 million.<br />

2-2 GNV310133632155.DOC/090840001