07.09.2015 Views

1 RC Managers Manual

  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Risk Assessment<br />

Training<br />

As with all activities, a suitable dynamic risk assessment should be conducted for each<br />

training session which will be based upon:<br />

●<br />

●<br />

●<br />

Prevailing weather conditions<br />

Ground conditions<br />

Players fitness (Individual and as a group)<br />

Training Equipment<br />

Where it is assessed that the conditions present a risk, then the training should not be<br />

conducted or should be adapted to mitigate any risks.<br />

All training equipment should be examined before use for suitability and safety, no<br />

equipment should be used that is either damaged or could cause harm to a child<br />

additionally training equipment should be used in a way that will not cause harm or<br />

injury.<br />

Goals<br />

Goals usually are the most significant risk and are to be anchored and set up in a way to<br />

prevent injury and are to be checked prior to use. A more detailed guide is included<br />

within this <strong>Manual</strong>.<br />

Training Sessions<br />

Coaches should plan each session. To assist Coaches there is a training plan template within this<br />

manual.<br />

To assist club coaches <strong>RC</strong>JFC has purchased the FA Grassroots Future Game <strong>Manual</strong>s.<br />

These are held by the Club Secretary and can be loaned to Coaches on a short time basis.<br />

8-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!