ASA Journal 05/22
Home Smart Home
Home Smart Home
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
102<br />
theme / review<br />
The long and narrow piece of land is five<br />
meters wide and 30 meters deep. The land<br />
is situated between old row houses located<br />
towards the north and south, directly facing<br />
the site. The land’s special characteristics<br />
made a new development highly challenging.<br />
The previous generations of owners didn’t<br />
care much about the land, leaving it as a<br />
parking space for local food kiosks, as well<br />
as a cooking and wash areas for tenants living<br />
in the neighboring row of houses. Once the<br />
building was inherited, the current owner<br />
decided to develop it into an establishment<br />
with maximized functionalities that the laws<br />
and regulations would allow. The new program<br />
is born as a five-room building that includes<br />
the functionality of a hotel and the owner’s<br />
living space.<br />
The first and second floor houses a restaurant<br />
with a portion of the second floor used as the<br />
hotel’s reception area. The third and fourth<br />
floor is where the hotel rooms are located<br />
with the fifth floor that is home to the owner’s<br />
living spaces and the hotel’s lounge occupying<br />
the rooftop. Design is about finding a solution.<br />
A good solution is a reflection of how cleverly<br />
the decisions are made and the methods<br />
devised. The diversity of the program and<br />
the narrow and deep shape of the land are<br />
what make the design challenging. Searching<br />
and choosing the right answer to solve the<br />
problems, therefore, are vital. The project<br />
showcases some interesting problem solving<br />
approaches from an attempt to manage the<br />
limited usable spaces. The 2.50-meter wide<br />
hotel rooms doesn’t feel as confined as they<br />
may seem thanks to the smart architectural<br />
design. Finding a solution from the contexts is<br />
the approach taken with this project be it the<br />
context of the site itself or that of Tanao road.<br />
08<br />
แปลนชั้น 1-5 และดาดฟ้า<br />
8