AFKO -> S022 on:<br />

AUFNR -> AUFNR<br />

PLNBEZ -> MATNR<br />

AFKO -> AFVC on:<br />

AUFPL -> AUFPL<br />

S022 -> AFVC on:<br />

WERKS -> WERKS<br />

PLNFL -> PLNFL<br />

VORNR -> VORNR<br />

The join below is for user fields in operation detail, you will have to find your own<br />

relevant table, but I assume the two key fields will be the same??<br />

AFVC -> AFVU on:<br />

AUFPL -> AUFPL - Routing number of operations in the order APLZL -> APLZL -<br />

General Counter for order<br />

Tips by : Robert<br />

MRP<br />

Why used <strong>Planning</strong> tools like APO or I2?<br />

APO and I2 are Finite PLANNING tools. When MRP runs with APO or I2 (or Red<br />

Pepper or Manugistics), it takes Capacity issues into consideration. MRP in <strong>SAP</strong> R/3<br />

Core does not, it assumes infinite capacity available. (MRP only looks at material<br />

availablity.)<br />

However, <strong>SAP</strong> R/3 DOES do finite SCHEDULING, which is where the system<br />

'dispatches" operations on a production order until it fills up the capacity available, then<br />

moves to the next time period and dispatches until that period is filled up. In <strong>SAP</strong> speak,<br />

that is called capacity leveling.<br />

I believe APO should only be used in very large companies (billions) because of the<br />

amount of master data that must be maintained, and that data better be ACURATE, or<br />

you've wasted a heck of a lot of time. By the way, APO stands for Advanced Planner and<br />

Optimizer tool, obviously a German sort of name!<br />

Differences between planning and scheduling, finite and infinite