Alternate sequences are linked to the standard sequence which is the main sequence. The<br />

place where alternate sequence starts from the standard sequence is called branch<br />

operation and again the place where it joins the standard sequence is called the return<br />

operation.<br />

Parellel sequences are set of operation which run parellel to the standard sequence, for<br />

example in a chemical industry for analytical processes that occur parellel to the main<br />

production process.<br />

Alternate sequence consists of set of operations other than the standard sequence so that<br />

either of the sequences can be run for a production process.Generally branch operations<br />

in the standard sequence are ingored in this process.<br />

Tips by : Karteek<br />

A basic <strong>SAP</strong> Engineering Change<br />

Management Setup<br />

This are the basic IMG settings in order to used the engineering change<br />

management<br />

features.<br />

x refers to a tick.<br />

First setup the control data in OS54.<br />

Revision sections<br />

Fields :-<br />

Revision level active x<br />

Ext. revision level x<br />

Higher revision level x<br />

Object Management Record sections<br />

Fields :-<br />

Object maintenance x<br />

Assign alternative date x<br />

Overide value/assignment date sections<br />

Fields :-<br />

Only with leading change mst. x