MRP area entered only.<br />

You define the MRP areas in Customizing for MRP. You can thereby assign<br />

the following to<br />

an MRP area: one or more storage locations (example: you want to carry<br />

out planning for a<br />

particular assembly line and therefore assign a production storage<br />

location to the MRP area)<br />

a subcontractor.<br />

You assign the various MRP areas to the materials in the material<br />

master. For this, you<br />

create an MRP area segment for a material for every MRP area, in which<br />

it is used. In this<br />

MRP area segment, you can define MRP parameters such as, for example,<br />

the lot size or MRP<br />

type. This allows you to plan the material differently in the MRP area<br />

from how you plan it<br />

in the plant MRP area.<br />

MRP with MRP areas for the material is not activated until the material<br />

has been assigned<br />

to an MRP area. If you have not assigned a material to an MRP area,<br />

that is, you have<br />

not created an MRP area segment in the material master, the material<br />

will continue to<br />

be planned in the plant MRP area only. If you have assigned an MRP area<br />

to it, the system<br />

can plan it in the plant MRP area and in the assigned MRP area.<br />

PP - The Common <strong>Planning</strong> Strategy used<br />

The planning strategies are maintained in Customizing for Demand Management in<br />

SM30 - V_T461S.<br />

Define the Planned Requirement Type and assign the requirement class in OMP1.<br />

Define the requirement class in OMPO.<br />

Check the independent requirement and consumption of requirement class in OMPC.<br />

Maintain the message for invalid requirement type in OMPJ.<br />

You define the strategy group in SM30 - V_T461P.<br />

You define the Plant to MRP group in SM30 - V_T438M_S.