3. using supply area and work center. create supply areas and link them to st. loc's. - then<br />
link the supply area to the work center on CR02. Then allocate components to operations<br />
going through those work centers.<br />
Note:<br />
Supply Areas are meant to be used in conjunction with Kanban. However you can just<br />
use them to link the work center to a storage location. You will never see an inventory<br />
balance in MMBE in a supply area. With Kanban you can set up automatic triggers to<br />
replenish stock to the supply areas from a main stock location.<br />
When is a Material BOM Not Exploded?<br />
A BOM is not exploded in the following situations:<br />
- No BOM is effective:<br />
-- On the explosion date and in the given area of validity<br />
For the given effectivity parameters<br />
- The BOM has a deletion indicator.<br />
- The BOM is a multiple BOM, and has no alternative that matches the lot size for your<br />
required quantity.<br />
- No BOM matches the selection criteria of the BOM application you selected.<br />
- This is possible in the following situations, for example:<br />
-- The application does not take all BOM usages into account.<br />
For example, the application only takes BOMs that are relevant to production into<br />
account, so a BOM that is relevant to sales and distribution is not exploded.<br />
-- The application selects a specific alternative on the explosion date you require. The<br />
material master record supports alternative determination by Explosion date.<br />
If the specified alternative is not valid on the explosion date, the BOM is not exploded.<br />
-- The application takes production versions in the material master record into account,<br />
but no production version has a BOM that is valid on the explosion date you require. The<br />
material master record supports alternative determination by <strong>Production</strong> version.<br />
The system only explodes the BOM defined for the production version that matches the<br />
alternative and/or usage entered on the explosion date required.<br />
-- The application only takes BOMs with certain status indicators into account.<br />
For example, the application for MRP only explodes BOMs that have at least the status<br />
Explosion for MRP.