…the system automatically selects the respective, document part, document version and<br />

document description<br />

Pre-requisites…<br />

…create document by transaction CV01N<br />

…Customizing settings…in document management customizing determines which<br />

objects can be assigned to documents per object type.<br />

…go to IMG -> cross-application components -> document management -> control data<br />

-> define documents type<br />

…select the document type for example `DRW'<br />

…select the sub dialog `define object links'<br />

…select new entries and enter following objects…<br />

…'STPO_DOC' and screen `257'(linking document to BOM header) …'STKO_DOC' and<br />

screen `258'(linking document to BOM item) …now documents can be linked to BOM<br />

header as well as BOM item.<br />

Tips by : Rakesh<br />

Split In Routing / Difference Between Alternative And<br />

Parallel Seq<br />

The term "Splitting" in <strong>SAP</strong> means having more than one person or maching working on<br />

an operation in a production order.<br />

<strong>SAP</strong> assumes that only one person/machine will be working on a job at a time. If it takes<br />

one hour to make one, and the order is for 10, the system will schedule the job at that<br />

work center to take 10 hours. However, if in the operation in the routing, you select<br />

"Required Splitting", then you put in "number of splits" as 2, then the system will assume<br />

you are having two people/machines work on the job at the same time, hence it will only<br />

schedule the job to take 5 hours, not 10. If you put in splitts as 4, then the system will<br />

assume 2.5 hours to get the job done.<br />

Also, sometimes it might be ridiculous to split the job. For instance, if that previous<br />

example order was only for 2 piedes. Having two machines working on it would be<br />

dumb, because you would have to do two setups. So the system gives you a Minimum<br />

processing time, so if it's less than, say, 5 hours, do not split it.<br />

What is the difference between alternative and parallel sequence.How these are<br />

used?<br />

Generally in routing 3 types of sequence are present which are standard, parellel and<br />

alternate sequence.