Notes to the Financial Statements - Cahaya Mata Sarawak Bhd
Notes to the Financial Statements - Cahaya Mata Sarawak Bhd
Notes to the Financial Statements - Cahaya Mata Sarawak Bhd
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Clinker<br />
CMS Cement owns East Malaysia’s sole clinker manufacturer,<br />
CMS Clinker Sdn <strong>Bhd</strong>, which operates a plant at Mambong on <strong>the</strong><br />
outskirts of Kuching. With a current production capacity of 800,000<br />
MT per annum, production meets 77% of <strong>the</strong> clinker demand from<br />
CMS Cement’s plant in Kuching.<br />
In 2011, CMS Clinker’s revenue rose 6% due <strong>to</strong> higher sales volume compared <strong>to</strong> 2010. The increased<br />
sales volume was attributed <strong>to</strong> <strong>the</strong> better operational performance of <strong>the</strong> plant which resulted in a<br />
higher production volume. CMS Clinker recorded a PBT of RM14.17 million for 2011,<br />
a 16% increase from 2010.<br />
In this industry, <strong>the</strong> three main fac<strong>to</strong>rs contributing signifi cantly <strong>to</strong> a plant’s performance are <strong>the</strong> stability<br />
of <strong>the</strong> manufacturing operations, maintaining continuous full production and lowering fuel costs.<br />
Based on this, CMS Clinker has invested RM78 million in upgrading its plant <strong>to</strong> increase <strong>the</strong> existing<br />
production capacity <strong>to</strong> 896,000 MT per annum and <strong>to</strong> modify <strong>the</strong> plant <strong>to</strong> run on locally mined coal of<br />
lower calorifi c value. The plant upgrading is expected <strong>to</strong> achieve improved performance in terms of<br />
reliability, effi ciency, lower fuel costs and thus, lower costs of production. The upgrading is scheduled <strong>to</strong><br />
be completed and commissioned by mid 2012.<br />
Annual Report 2011 25