2010 DEM <strong>Work</strong>plan <strong>Report</strong> - All Offices 12/13/2010<br />

Strategy Project/Activity Deliverable Deliverable Target Date Current<br />

Status<br />

O. Conduct Inspections<br />

for Pesticide<br />

Compliance<br />

O. Conduct Inspections<br />

for Pesticide<br />

Compliance<br />

O. Conduct Inspections<br />

for Pesticide<br />

Compliance<br />

P. Conduct Sludge<br />

Handling Inspections<br />

f. Conduct 10 Licensed<br />

Dealers Records<br />

Review<br />

g. Ensure compliance<br />

with <strong>Work</strong>er Protection<br />

Standards at<br />

Agricultural<br />

Establishments<br />

h. Schedule one<br />

oversight inspection<br />

with EPA in FY 2010.<br />

a. conduct 25 sludgehandling<br />

inspections<br />

annually.<br />

1. 10 Licensed Dealers<br />

Records Reviewed<br />

1. Conduct 5<br />

Inspections<br />

1. Coordinate 1<br />

oversight inspection<br />

with EPA in 2010<br />

Complete: 12 inspections conducted in 2010 as per discussion at the<br />

Pesticides Program meeting <strong>of</strong> 11/3/10.<br />

Complete: 10 inspections conducted in 2010 as per discussion at the<br />

Pesticides Program meeting <strong>of</strong> 11/3/10.<br />

Complete: 1 inspection conducted in 2010 as per discussion at the<br />

Pesticides Program meeting <strong>of</strong> 11/3/10.<br />

On Track: Previous update was in error. 22 inspections conducted as <strong>of</strong><br />

3/31/10.<br />

Primary<br />

Staff<br />

09/30/2010 Complete SCANDARIATO MOONEY<br />

THOMAS<br />

GETZ<br />

09/30/2010 Complete SCANDARIATO MOONEY<br />

THOMAS<br />

GETZ<br />

09/30/2010 Complete SCANDARIATO MOONEY<br />

THOMAS<br />

GETZ<br />

209 <strong>of</strong> 268<br />

Delegate Staff<br />

<strong>Progress</strong>: Created By: Date Created:<br />

11/16/2010<br />

<strong>Progress</strong>: Created By: Date Created:<br />

11/16/2010<br />

<strong>Progress</strong>: Created By: Date Created:<br />

11/16/2010<br />

1. Inspection reports 09/30/2010 Complete PINTO PATENAUDE<br />

<strong>Progress</strong>: Created By: Date Created:<br />

Behind Schedule: Behind schedule. ALEX PINTO 05/07/2010<br />

ALEX PINTO 05/07/2010<br />

On Track: Sludge inspections on track. ALEX PINTO 06/25/2010<br />

On Track: Sludge inspections on track. ALEX PINTO 08/30/2010<br />

Complete: Sludge inspections completed. ALEX PINTO 09/30/2010