• Need to discuss with the Region for FY 2011 on what an appropriate mix <strong>of</strong> LQGs and SQGs<br />

for RCRA inspections.<br />

• Short term priority is participating in the discussions about the permitting/enforcement intersect<br />

coming out <strong>of</strong> the CWA action plan. There is an interest in a meeting with the other authorized<br />

states to discuss the topics.<br />

• EPA was interested in DEM’s Mystic River approach focusing on bacteria.<br />

• RI sees a lot at stake for FY 11 in permit/enforcement issues and the “resetting <strong>of</strong> the state/EPA<br />

relationship.”<br />

• Frequency <strong>of</strong> RCRA inspections at either good or bad facilities is an issue.<br />

• State does not have a relationship with its tribes. The lack <strong>of</strong> one is a fallout from other actions<br />

not involving RIDEM.<br />

• Wetlands enforcement is difficult post-Rapanos; but more importantly the staff reduction <strong>of</strong><br />

staff (5 FTEs down to 2 FTEs) is posing a problem. Wetlands enforcement is a specialty area<br />

that needs specific training particularly with construction storm water overlay. DEM could use<br />

assistance from Army Corps.<br />

• Lead RRP is DOH issue. DOH has applied and has been given primacy for rule<br />

implementation and enforcement.<br />

Meeting Summary<br />

• RIDEM needs flexibilities from Region I going into FY 2011 in recognition <strong>of</strong> staff/resource<br />

limitations<br />

• RIDEM will identify training needs and work with region.<br />

• Post 06/2011 may cause concern and consternation. Region needs to be prepared to factor in to<br />

EOY FY 2011 activities.<br />

• Data quality/transparency is an on-going issue that needs constant attention.<br />

27