2010 DEM <strong>Work</strong>plan <strong>Report</strong> - All Offices 12/13/2010<br />

Strategy Project/Activity Deliverable Deliverable Target Date Current<br />

Status<br />

D. Ensure WWTF's are<br />

designed, constructed<br />

and operated to<br />

protect the quality <strong>of</strong><br />

the State's waters.<br />

D. Ensure WWTF's are<br />

designed, constructed<br />

and operated to<br />

protect the quality <strong>of</strong><br />

the State's waters.<br />

D. Ensure WWTF's are<br />

designed, constructed<br />

and operated to<br />

protect the quality <strong>of</strong><br />

the State's waters.<br />

D. Ensure WWTF's are<br />

designed, constructed<br />

and operated to<br />

protect the quality <strong>of</strong><br />

the State's waters.<br />

f. Administer DMR QA<br />

Study.<br />

f. Administer DMR QA<br />

Study.<br />

g. Revise the sludge<br />

regulations to allow for<br />

more beneficial reuse<br />

<strong>of</strong> biosolids.<br />

g. Revise the sludge<br />

regulations to allow for<br />

more beneficial reuse<br />

<strong>of</strong> biosolids.<br />

1. Review DMR QA<br />

study 29 results.<br />

2. Review DMR QA<br />

Study 30 results.<br />

1. Stakeholder input<br />

(workshops, etc)<br />

2. Internal<br />

comment/feedback<br />

period completed<br />

11/30/2009 Complete PINTO PATENAUDE<br />

11/14/2009 Complete PINTO PATENAUDE<br />

51 <strong>of</strong> 268<br />

On Track: DMR QA Study has begun and is on track. ALEX PINTO 05/07/2010<br />

On Track: DMR QA Study ongoing and on track. ALEX PINTO 06/25/2010<br />

On Track: DMR QA Study 30 on track and nearing completion. Lab<br />

results have been submitted to DEM. Results are under review.<br />

Primary<br />

Staff<br />

Delegate Staff<br />

12/04/2009 Complete PINTO PATENAUDE<br />

<strong>Progress</strong>: Created By: Date Created:<br />

Complete: DMR Study 29 was completed on 12/4/09. ALEX PINTO 05/07/2010<br />

09/06/2010 Complete PINTO PATENAUDE<br />

<strong>Progress</strong>: Created By: Date Created:<br />

ALEX PINTO 08/30/2010<br />

Complete: Study completed. ALEX PINTO 10/08/2010<br />

<strong>Progress</strong>: Created By: Date Created:<br />

Behind Schedule: Behind schedule. ALEX PINTO 05/07/2010<br />

Complete: Informal comment period completed. ALEX PINTO 07/07/2010<br />

<strong>Progress</strong>: Created By: Date Created:<br />

Complete: Internal comment period completed. ALEX PINTO 05/07/2010