2010 DEM <strong>Work</strong>plan <strong>Report</strong> - All Offices 12/13/2010<br />

Strategy Project/Activity Deliverable Deliverable Target Date Current<br />

Status<br />

D. Ensure WWTF's are<br />

designed, constructed<br />

and operated to<br />

protect the quality <strong>of</strong><br />

the State's waters.<br />

D. Ensure WWTF's are<br />

designed, constructed<br />

and operated to<br />

protect the quality <strong>of</strong><br />

the State's waters.<br />

D. Ensure WWTF's are<br />

designed, constructed<br />

and operated to<br />

protect the quality <strong>of</strong><br />

the State's waters.<br />

c. Investigate<br />

WWTF/collection<br />

system bypass/over<br />

flow events and WWTF<br />

operational problems.<br />

Take appropriate follow<br />

up actions >2 months<br />

after investigation is<br />

completed.<br />

d. Review and<br />

approve I/I and SSES<br />

reports and project<br />

designs to reduce<br />

system overflows (2<br />

total - Woonsocket,<br />

Newport).<br />

e. Coordinate with EPA<br />

on the priority SSO<br />

initiative<br />

1. Inspection reports<br />

and recommendations<br />

within 2 months <strong>of</strong><br />

investigation<br />

1. Communications as<br />

needed<br />

09/28/2010 Behind<br />

Schedule<br />

On Track: Ongoing investigations and actions taken per event type, etc. BILL<br />

PATENAUDE<br />

Behind Schedule: While generally on track, O&M needs to determine the<br />

appropriate close-out function for events from the floods <strong>of</strong> March 2010.<br />

Other events are ongoing.<br />

Primary<br />

Staff<br />

1. Approvals 09/30/2010 Complete ZEMAN PATENAUDE<br />

09/30/2010 Complete LIBERTI GOOD<br />

On Track: On Track 7/6/10 ANGELO<br />

LIBERTI<br />

Complete: ongoing coordination ALICIA<br />

GOOD<br />

PATENAUDE LIBERTI<br />

BILL<br />

PATENAUDE<br />

50 <strong>of</strong> 268<br />

Delegate Staff<br />

<strong>Progress</strong>: Created By: Date Created:<br />

07/07/2010<br />

09/08/2010<br />

<strong>Progress</strong>: Created By: Date Created:<br />

On Track: On track ART ZEMAN 07/12/2010<br />

On Track: 9/8/10 On track ART ZEMAN 09/08/2010<br />

Complete: complete as <strong>of</strong> 9/30/10. Ongoing task. ART ZEMAN 10/27/2010<br />

<strong>Progress</strong>: Created By: Date Created:<br />

07/06/2010<br />

11/04/2010