2010 DEM <strong>Work</strong>plan <strong>Report</strong> - Office <strong>of</strong> the Director<br />

12/13/2010<br />

Strategy Project/Activity Deliverable Deliverable Target Date Current<br />

Status<br />

B. Provide<br />

accountability <strong>of</strong> the<br />

DEM environmental<br />

programs through<br />

work plan reports that<br />

tracks its<br />

implementation<br />

B. Provide<br />

accountability <strong>of</strong> the<br />

DEM environmental<br />

programs through<br />

work plan reports that<br />

tracks its<br />

implementation<br />

B. Provide<br />

accountability <strong>of</strong> the<br />

DEM environmental<br />

programs through<br />

work plan reports that<br />

tracks its<br />

implementation<br />

��������������������<br />

������������������<br />

�����������������<br />

���������������������<br />

��������������������<br />

�������������������<br />

��������������������<br />

������������������<br />

�����������������<br />

���������������������<br />

��������������������<br />

�������������������<br />

��������������������<br />

������������������<br />

�����������������<br />

���������������������<br />

��������������������<br />

�������������������<br />

��������������������<br />

����������������������<br />

������������������<br />

�������������������<br />

�����������������������<br />

������������������������<br />

03/15/2010 Complete GETZ<br />

4. If necessary, DEM<br />

will provide EPA with a<br />

response to EPA's<br />

comments on DEM's<br />

PPA progress report.<br />

Complete: No issues were raised that needed a response or meeting.<br />

This deliverable is complete.<br />

04/17/2010 Complete GETZ<br />

Complete: There were no issues raised that need discussion; therefore<br />

this deliverable is complete.<br />

5. RIDEM and EPA will<br />

hold annual program<br />

meeting(s) during PPA<br />

negotiations to perform<br />

a joint evaluation <strong>of</strong><br />

the RI environmental<br />

efforts.<br />

09/01/2010 Complete GETZ<br />

On Track: EPA notified DEM on 5/6/10 that the revised P&C list is<br />

undegoing EPA Reg I review. RIDEM should get revised list in early June.<br />

Program meetings will be scheduled with EPA after receipt <strong>of</strong> P&C List.<br />

On Track: DEM/EPA Air, RCRA, Water, Pesticides and Compliance<br />

Programs have all met and are finalizing the P&C List. <strong>Work</strong>plans work<br />

has commenced.<br />

Complete: Joint evaluations between the programs will be documented in<br />

the end <strong>of</strong> year report. DEM is willing to meet with EPA to further discuss<br />

this issue.<br />

Complete: Joint evaluations between the programs will be documented in<br />

the end <strong>of</strong> year report. DEM is willing to meet with EPA to further discuss<br />

this issue.<br />

Primary<br />

Staff<br />

THOMAS<br />

GETZ<br />

THOMAS<br />

GETZ<br />

THOMAS<br />

GETZ<br />

THOMAS<br />

GETZ<br />

THOMAS<br />

GETZ<br />

THOMAS<br />

GETZ<br />

05/07/2010<br />

05/07/2010<br />

05/07/2010<br />

08/19/2010<br />

10/29/2010<br />

10/29/2010<br />

6 <strong>of</strong> 6<br />

Delegate Staff<br />

<strong>Progress</strong>: Created By: Date Created:<br />

<strong>Progress</strong>: Created By: Date Created:<br />

<strong>Progress</strong>: Created By: Date Created: