Eric indicated DEM is participating in the national review <strong>of</strong> the MS4 program. Eric mentioned that<br />

Deb Merrill’s s<strong>of</strong>tware package will assist in the collection and analysis <strong>of</strong> this data. He also<br />

mentioned that the information could also be used as a compliance resource.<br />

Eric mentioned it was the goal <strong>of</strong> the program to shorten the length <strong>of</strong> time to review the MS4 Program<br />

compliance from 24 months to six months. He would like to move forward with state regulations that<br />

coordinate a number <strong>of</strong> issues like the Stormwater Manual and the stormwater ERP. He did mention<br />

there was an issue concerning wet weather versus dry weather monitoring that needs to be addressed.<br />

Dave indicated DEM should move forward with the regulations.<br />

DEM will include the EPA ELG for the construction industry in the draft GP for stormwater<br />

discharges associated with construction activity.<br />

Dave mentioned that DEM should be mindful <strong>of</strong> the court date requirement in P&C List Item 92 that<br />

indicated when pesticide use in or near surface water would require a RIPDES Permit.<br />

It was agreed the reissuance <strong>of</strong> the industrial stormwater GP should be completed by May 2011.<br />

DEM indicated the UIC Primacy Regulations were in draft form. As soon as the Stormwater Manual is<br />

finalized, the UIC Regulations will be finalized.<br />

EPA indicated there was a meeting concerning water compliance/enforcement that will be held in<br />

August. EPA encouraged DEM’s participation and will provide DEM with additional information<br />

concerning this meeting.<br />

There was a brief discussion on tribal issues concerning the use <strong>of</strong> the state revolving fund. Lynne was<br />

encouraged to talk to Lois Adams to make sure there were no outstanding issues on this topic that<br />

would hold up the signing <strong>of</strong> the PPA.<br />

Alicia and Lynne agreed that there did not appear to be any problems with the PPA that would need<br />

problem resolution. Tom encouraged both parties to make changes to the P&C List in the next two<br />

weeks. It would be DEM’s goal to complete a draft <strong>of</strong> the workplan by September 1, 2010.<br />