18.01.2013 Views

Download (2.2 MB) - Volksbank AG

Download (2.2 MB) - Volksbank AG

Download (2.2 MB) - Volksbank AG

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

40<br />

30<br />

20<br />

10<br />

FACTORS OF INCREASED EARNINGS IN 2004<br />

in EUR m 2003 2004<br />

Net interest income 23.1 42.5<br />

Credit risk provisions (net) 0.0 -1.2<br />

Other operating income 2.1 1.3<br />

General administrative expenses<br />

Balance of other income<br />

-6.4 -7.0<br />

and expenses -1.0 -1.5<br />

Pre-tax profit 17.7 34.1<br />

After-tax profit 16.5 25.7<br />

Segment profit 11.4 15.6<br />

Segment assets 682 763<br />

Risk-earnings ratio 0.1% 2.9%<br />

Cost-income ratio 25.4% 15.6%<br />

Return on assets<br />

Return on equity –<br />

3.13% 3.55%<br />

segment profit 14.2% 15.1%<br />

0<br />

There was an 84% overall improvement in net<br />

interest income after refinancing expenses, bringing<br />

it to EUR 42.5 m. That provided the basis for<br />

the improvement in the result: Pre-tax profit<br />

improved by 93% and the segment profit by 37%.<br />

SEGMENT RESULT REAL ESTATE<br />

SEGMENT REPORTING / REAL ESTATE<br />

Fields of business in the<br />

real estate segment<br />

REAL ESTATE PROJECT<br />

DEVELOPMENTS<br />

“River City Prague” real estate project<br />

developments<br />

In real estate project developments, due to the<br />

excellent rental level at “Danube House”, construction<br />

of “Nile House” began<br />

early in 2004. The completion<br />

of this second office building in<br />

the “River City Prague” project<br />

is scheduled for the end of<br />

2005. It has a usable floor space of 19,350 m2 “DANUBE HOUSE”<br />

.<br />

Work has started on the third stage of the “River<br />

City Prague” project under the name of “Amazon<br />

Court”. A Danish team of architects, Schmidt,<br />

Hammer & Lassen, won the competition for this<br />

mixed-use building. As well as office space that<br />

can be flexibly arranged in the building, there will<br />

also be retail space on the ground floor. Construction<br />

should commence in the middle of 2006.<br />

2000 2001 2002<br />

2003<br />

2004<br />

After-tax profit Segment profit Return on equity (RoE) – Segment profit<br />

“NILE HOUSE” CARRIES<br />

ON THE SUCCESS OF<br />

in EUR m RoE in %<br />

2.0%<br />

1<br />

1<br />

11<br />

16.7%<br />

7<br />

14<br />

15.6%<br />

8<br />

18<br />

11<br />

34<br />

14.2% 15.1%<br />

16<br />

20%<br />

15%<br />

10%<br />

5%<br />

0%<br />

67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!