Bldg. No.3: Hampton Inn & Suites<br />
Basic Build<strong>in</strong>g Data<br />
Build<strong>in</strong>g Name Hampton Inn & Suites<br />
Build<strong>in</strong>g Address 3279 Caroga Drive<br />
Build<strong>in</strong>g Use Hotel<br />
Hours of Operation 24/7<br />
Total Build<strong>in</strong>g Area TBD m² (TBD ft²)<br />
No. of Stories 9 above grade/1 below<br />
Current Installed Capacity 156 kW pool/laundry heat<strong>in</strong>g /500 kW DHW<br />
Build<strong>in</strong>g Age 2003<br />
Age of Equipment<br />
Build<strong>in</strong>g HVAC System Description:<br />
Rooms are heated with electric resistance elements, likely <strong>in</strong> through-the-wall package heat<br />
pump or air condition<strong>in</strong>g units. There are two direct fired make up air units with DX cool<strong>in</strong>g<br />
coils that serve the common areas.<br />
The heat<strong>in</strong>g for the pool and laundry are provided by one hot water boiler, Laars 156 kW<br />
output (531 MBH/625 MBH <strong>in</strong>put), located <strong>in</strong> the basement mechanical room.<br />
The domestic hot water system is comprised of two (2) boilers, Laars 250 kW output<br />
(850MBH/1,000 MBH <strong>in</strong>put) and two (2) 1,100 gal. Loch<strong>in</strong>var storage tanks located <strong>in</strong> the<br />