TRCA Pearson Eco-Bus<strong>in</strong>ess Zone <strong>District</strong> <strong>Energy</strong> <strong>Feasibility</strong> <strong>Study</strong> 10 April 2012<br />

expect that should a DES become established, it would cont<strong>in</strong>ue to grow connect<strong>in</strong>g additional<br />

multi-storey build<strong>in</strong>gs along Airport Road.<br />

Map # Load Description Visited ? Heat<strong>in</strong>g Load (kW) Cool<strong>in</strong>g Load (tons)<br />

1 Hilton Garden Inn yes 825 250<br />

2 Marriott Fairfield Inn & Suites no 600 200<br />

3 Hampton Inn & Suites yes 400<br />

4 Airway Center yes 1,400 800<br />

5 Hilton Airport Hotel yes 1,600 570<br />

Subtotal 1A<br />

4,825 1,820<br />

6 Holiday Inn no 1,400 360<br />

7 West<strong>in</strong> Bristol Place yes 1,600 290<br />

8 Quality Suite Inn yes 900 310<br />

9 Travel Lodge yes 600 310<br />

10 Courtyard by Marriott no 2,100 590<br />

11 Toronto Marriott Airport Hotel yes 2,400 650<br />

Subtotal 1<br />

9,000 2,510<br />

26 Chase Bank Build<strong>in</strong>g yes 200 110<br />

27 Orlando yes 400 130<br />

28 Four Po<strong>in</strong>ts Sheraton no 500 130<br />

29 Ontario General Contractors no 400 230<br />

30 Comfort Inn no 400 100<br />

Subtotal 2<br />

1,900 700<br />

33 Cott Beverages yes 1,200 110<br />

34 W<strong>in</strong>ner Offices no 700 260<br />

35 International Center yes 500 760<br />

36 Booth Centennial yes 4,200 560<br />

Subtotal 3<br />

Total<br />

15<br />

6,600 1,690<br />

22,325 6,720<br />

Table 3 Estimated Heat<strong>in</strong>g and Cool<strong>in</strong>g Loads by Phase<br />

The feasibility of connect<strong>in</strong>g prospects east of Mimico Creek, Figure 2 #’s 12 through 23 would<br />

require a special <strong>in</strong>vestigation of the issue of us<strong>in</strong>g the bridge(s) as pipe supports. This might<br />

be feasible as an eventual system expansion provided Phase 1 was established.<br />

The possibility of serv<strong>in</strong>g additional build<strong>in</strong>gs on airport property, i.e. south of Airport Road, not<br />

already served by the proposed system could be <strong>in</strong>vestigated later if a core DES became<br />

established.<br />

2.2 Load Diversification Factor<br />

A DES will normally have a lower thermal peak than the sum of the <strong>in</strong>dividual build<strong>in</strong>gs’ thermal<br />

peaks. This is due to the fact that <strong>in</strong>dividual build<strong>in</strong>gs reach their respective thermal peaks at<br />

different times dur<strong>in</strong>g the day. This is known as load diversification. The mix of different