TRCA Pearson Eco-Bus<strong>in</strong>ess Zone <strong>District</strong> <strong>Energy</strong> <strong>Feasibility</strong> <strong>Study</strong> 10 April 2012<br />
expect that should a DES become established, it would cont<strong>in</strong>ue to grow connect<strong>in</strong>g additional<br />
multi-storey build<strong>in</strong>gs along Airport Road.<br />
Map # Load Description Visited ? Heat<strong>in</strong>g Load (kW) Cool<strong>in</strong>g Load (tons)<br />
1 Hilton Garden Inn yes 825 250<br />
2 Marriott Fairfield Inn & Suites no 600 200<br />
3 Hampton Inn & Suites yes 400<br />
4 Airway Center yes 1,400 800<br />
5 Hilton Airport Hotel yes 1,600 570<br />
Subtotal 1A<br />
4,825 1,820<br />
6 Holiday Inn no 1,400 360<br />
7 West<strong>in</strong> Bristol Place yes 1,600 290<br />
8 Quality Suite Inn yes 900 310<br />
9 Travel Lodge yes 600 310<br />
10 Courtyard by Marriott no 2,100 590<br />
11 Toronto Marriott Airport Hotel yes 2,400 650<br />
Subtotal 1<br />
9,000 2,510<br />
26 Chase Bank Build<strong>in</strong>g yes 200 110<br />
27 Orlando yes 400 130<br />
28 Four Po<strong>in</strong>ts Sheraton no 500 130<br />
29 Ontario General Contractors no 400 230<br />
30 Comfort Inn no 400 100<br />
Subtotal 2<br />
1,900 700<br />
33 Cott Beverages yes 1,200 110<br />
34 W<strong>in</strong>ner Offices no 700 260<br />
35 International Center yes 500 760<br />
36 Booth Centennial yes 4,200 560<br />
Subtotal 3<br />
Total<br />
15<br />
6,600 1,690<br />
22,325 6,720<br />
Table 3 Estimated Heat<strong>in</strong>g and Cool<strong>in</strong>g Loads by Phase<br />
The feasibility of connect<strong>in</strong>g prospects east of Mimico Creek, Figure 2 #’s 12 through 23 would<br />
require a special <strong>in</strong>vestigation of the issue of us<strong>in</strong>g the bridge(s) as pipe supports. This might<br />
be feasible as an eventual system expansion provided Phase 1 was established.<br />
The possibility of serv<strong>in</strong>g additional build<strong>in</strong>gs on airport property, i.e. south of Airport Road, not<br />
already served by the proposed system could be <strong>in</strong>vestigated later if a core DES became<br />
established.<br />
2.2 Load Diversification Factor<br />
A DES will normally have a lower thermal peak than the sum of the <strong>in</strong>dividual build<strong>in</strong>gs’ thermal<br />
peaks. This is due to the fact that <strong>in</strong>dividual build<strong>in</strong>gs reach their respective thermal peaks at<br />
different times dur<strong>in</strong>g the day. This is known as load diversification. The mix of different