Bldg. No.4: Airway Centre<br />

Basic Build<strong>in</strong>g Data<br />

Build<strong>in</strong>g Name Airway Centre<br />

Build<strong>in</strong>g Address 5955 Airport Road<br />

Build<strong>in</strong>g Use 4 or 5 Office Build<strong>in</strong>gs<br />

Hours of Operation 24/7<br />

Total Build<strong>in</strong>g Area TBD m² (TBD ft²) 440,000 or 675,000 ft2<br />

No. of Stories<br />

Current Installed Capacity<br />

Build<strong>in</strong>g Age<br />

Age of Equipment<br />

Build<strong>in</strong>g HVAC System Description:<br />

The build<strong>in</strong>g(s) has a heat pump system to provide heat<strong>in</strong>g and cool<strong>in</strong>g. The account manager<br />

<strong>in</strong>dicated that there were a total of fifteen (15) gas fired boilers rated at ~375 kW output (1275<br />

MBH/1500 MBH <strong>in</strong>put) each between the 4-5 office build<strong>in</strong>gs. The build<strong>in</strong>g representative<br />

estimated that there are approximately 20-22 heat pumps per floor of each build<strong>in</strong>g (total<strong>in</strong>g<br />

600-700 units).<br />

No additional <strong>in</strong>formation.