TRCA Pearson Eco-Bus<strong>in</strong>ess Zone <strong>District</strong> <strong>Energy</strong> <strong>Feasibility</strong> <strong>Study</strong> 10 April 2012<br />

Fixed Costs<br />

Pearson DES<br />

Labour (CAD) (3 FTE) <strong>in</strong> $ per year 184,605<br />

Ma<strong>in</strong>tenance Cost (% capital) 1.00%<br />

Insurance (% of capital cost) 0.25%<br />

Land Lease (CAD) <strong>in</strong> $ per year 66,000<br />

Corporate Overheads (CAD million)<br />

Development Costs 2012-2014 0.15<br />

Salary and G&A expenses 2015 onwards 0.15<br />

75<br />

per year<br />

per year<br />

Plant G&A (CAD million)<br />

Plant G&A (a fixed amount escalat<strong>in</strong>g) 5%<br />

Subject to maximum of 0.10 per year<br />

8.4 F<strong>in</strong>ancial Results<br />

Table 23 Heat<strong>in</strong>g Fixed Cost Assumptions<br />

The Bus<strong>in</strong>ess Model is based on supply<strong>in</strong>g heat only to the 11 identified customers, together<br />

with a 4 MWe CHP Facility per the CHP Standard Offer Program. The projected unlevered<br />

Internal Rate of Return (IRR) is 5% over a 25 year operat<strong>in</strong>g period.<br />

F<strong>in</strong>ancial projections are presented <strong>in</strong> the follow<strong>in</strong>g tables:<br />

Table 25 – Income Statement <strong>Project</strong>ion<br />

Table 26 – Balance Sheet <strong>Project</strong>ion<br />

Table 27 – Cash Flow Statement <strong>Project</strong>ion<br />

These summary tables show the pro forma f<strong>in</strong>ancial statements for ten years of operations. The<br />

pr<strong>in</strong>touts <strong>in</strong> Appendix H show the statements from the start of project development <strong>in</strong> 2012<br />

through 25 years of operation to 2039.