Good system testing requires<br />

TWO iteration cycles<br />

Iterations help your team stay focused, deal with just a manageable<br />

amount <strong>of</strong> user stories, and keep you from getting too far ahead<br />

without built-in checkpoints with your customer.<br />

But you need all the same things for good system testing. So what if<br />

you had two cycles <strong>of</strong> iterations going on?<br />

The development<br />

team is hard at<br />

work on their<br />

first iteration.<br />

After delivering<br />

Iteration 1’s build<br />

the development<br />

team goes right<br />

into Iteration 2,<br />

and then 3, etc..<br />

Sometimes you need<br />

a dedicated bug fix<br />

iteration. In that case,<br />

you’d deliver a few builds<br />

within a single iteration.<br />

<strong>Development</strong> team Testing team<br />

Iteration<br />

1<br />

Iteration<br />

2<br />

Iteration<br />

3<br />

Bug fixes<br />

“It. 1” is short<br />

for Iteration<br />

1, “It. 2” for<br />

Iteration 2, etc.<br />

The test team sends<br />

bug reports back<br />

to be rolled into a<br />

later iteration.<br />

Things always tighten up<br />

at the end <strong>of</strong> a project.<br />

Download at WoweBook.Com<br />

Prep for<br />

It. 1<br />

Test It.<br />

1’s build<br />

Test It.<br />

2’s build<br />

Test It.<br />

3’s build<br />

ending an iteration<br />

This assumes you’ve got two separate teams:<br />

one working on code, the other handling<br />

system testing. But the same principles apply<br />

if your second team is other developers.<br />

The test team has an<br />

entire iteration to<br />

prep. They’re getting<br />

familiar with the<br />

stories for the incoming<br />

iteration, getting their<br />

environment in place,<br />

building system tests, etc.<br />

At the end <strong>of</strong><br />

each iteration<br />

the development<br />

team delivers that<br />

iteration’s build to<br />

the testing team.<br />

At this point, the<br />

test team signs <strong>of</strong>f on<br />

a working version, or<br />

milestone, or release.<br />

you are here 4 327