02.02.2013 Views

Coal Combustion Waste Management at - DOE - Fossil Energy ...

Coal Combustion Waste Management at - DOE - Fossil Energy ...

Coal Combustion Waste Management at - DOE - Fossil Energy ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A-63<br />

A.7 CLOSURE/POST-CLOSURE REQUIREMENTS IN THE PILOT STATES<br />

A.7.1 Summary<br />

Closure controls may be required to prevent post-closure migr<strong>at</strong>ion of contaminants out<br />

of a CCW land disposal facility via surface w<strong>at</strong>er p<strong>at</strong>hways or leaching to groundw<strong>at</strong>er. If<br />

closure controls are required, specific<strong>at</strong>ions may address cover system design requirements<br />

(i.e., caps), cover m<strong>at</strong>erial and thickness, and maximum hydraulic conductivity of the cover.<br />

Table A.17 summarizes the closure/post-closure requirements for landfills and surface<br />

impoundments in the five pilot St<strong>at</strong>es of Illinois, Indiana, Pennsylvania, Virginia, and Wisconsin.<br />

Additional details are provided in Section A.7.3.<br />

A.7.2 Chronological Comparison of Closure/Post-Closure Requirements<br />

for Landfills in Pilot St<strong>at</strong>es<br />

Table A.18 compares the findings regarding closure/post-closure requirements for<br />

landfills th<strong>at</strong> receive CCWs in the five pilot St<strong>at</strong>es (“2005 D<strong>at</strong>a”) with the closure/post-closure<br />

requirements for CCW landfills reported in EPA 1988 and EPA 1999a.<br />

A.7.3 St<strong>at</strong>e-Specific Discussion of Closure and Post-Closure Care Requirements<br />

Illinois—Within 60 days after placement of the final waste volume, a cap must be<br />

installed over the entire surface of the landfill. The cap must consist of one of the following:<br />

Compacted earth <strong>at</strong> least 3 ft thick having a hydraulic conductivity of no more<br />

than 1.0 × 10 -7 cm/s;<br />

Geomembrane capable of performance equal to th<strong>at</strong> of a compacted<br />

earthen cap, or<br />

Any other cap demonstr<strong>at</strong>ed to have performed equally as well as or better<br />

than a compacted earthen cap.<br />

The owner/oper<strong>at</strong>or must prepare and maintain a written closure plan. Final slopes and<br />

contours must be designed to complement and blend with the surrounding topography of the<br />

proposed final land use of the area, and the final configur<strong>at</strong>ion should minimize further<br />

maintenance. Quarterly inspections of veget<strong>at</strong>ed areas are required for <strong>at</strong> least 5 years after<br />

closure. Thereafter, annual inspections are required until either 15 years have passed or settling<br />

and erosion have stopped, whichever occurs first. Groundw<strong>at</strong>er monitoring also must continue<br />

for a minimum period of 15 years after closure (35 Ill. Adm. Code 811.110, 111, and 314).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!