Coal Combustion Waste Management at - DOE - Fossil Energy ...
Coal Combustion Waste Management at - DOE - Fossil Energy ...
Coal Combustion Waste Management at - DOE - Fossil Energy ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TABLE K.1 (Cont.)<br />
Variance<br />
Variance<br />
Regul<strong>at</strong>ion<br />
Regul<strong>at</strong>ion<br />
ID St<strong>at</strong>e Granted C<strong>at</strong>egory<br />
Description<br />
Summary<br />
Cit<strong>at</strong>ion<br />
209 WI Yes Liner Variance allowing a penetr<strong>at</strong>ion through All composite lined landfills shall be Wis. Adm. Code NR 504.06(5)(j)<br />
requirements the sideslope of the liner to accommod<strong>at</strong>e designed and constructed with sumps and<br />
gravity drain to the leach<strong>at</strong>e-collection sideslope risers as part of their leach<strong>at</strong>e<br />
tank.<br />
removal system, r<strong>at</strong>her than utilizing<br />
systems th<strong>at</strong> penetr<strong>at</strong>e the composite liner<br />
sidewall.<br />
205 WV Yes Cover/dust Variance to waive the requirement in the Solid waste fill surfaces exposed to we<strong>at</strong>her 33 CSR 4.6.b.2.B and<br />
controls regul<strong>at</strong>ions for 12 in. of compacted for periods in excess of 30 days must have 33 CSR 4.6.b.2.D.2<br />
intermedi<strong>at</strong>e cover m<strong>at</strong>erial on landfill a minimum of 12 in. of compacted cover<br />
areas exposed to we<strong>at</strong>her for periods in m<strong>at</strong>erial applied within 30 days of<br />
excess of 30 days.<br />
completion of the fill surface.<br />
204 WV Yes Cover/dust Variance to waive the requirement in the Solid waste fill surfaces th<strong>at</strong> remain 33 CSR 4.6.b.2.B<br />
controls regul<strong>at</strong>ions for 12 in. of compacted exposed to we<strong>at</strong>her for periods in excess of<br />
intermedi<strong>at</strong>e cover m<strong>at</strong>erial on landfill 30 days must have a minimum of 12 in. of<br />
areas exposed to we<strong>at</strong>her for periods in compacted cover m<strong>at</strong>erial applied within<br />
excess of 30 days.<br />
30 days of completion of the fill surface.<br />
205 WV Yes Daily cell Variance to waive the requirement th<strong>at</strong> Daily cell height must not exceed 8 ft in the 33 CSR 4.6.b.1.B<br />
height daily cell height must not exceed 8 ft in the vertical dimension, other than in the<br />
vertical dimension, other than in the middle, to divert storm w<strong>at</strong>er; th<strong>at</strong> vertical<br />
middle, where the vertical dimension can<br />
be as high as 11 ft to divert storm w<strong>at</strong>er.<br />
dimension must not exceed 11 ft.<br />
205 WV Yes Daily cover/ Variance to waive the requirement for Exposed solid waste disposal area must be 33 CSR 4.6.b.2.A and<br />
dust controls cover with gre<strong>at</strong>er than 6 in. of compacted covered with a minimum of 6 in. of 33 CSR 4.6.b.2.D.1<br />
cover m<strong>at</strong>erial <strong>at</strong> the end of each oper<strong>at</strong>ing compacted cover m<strong>at</strong>erial <strong>at</strong> the end of<br />
day.<br />
each oper<strong>at</strong>ing day, or more frequently as<br />
needed.<br />
204 WV Yes Daily cover/ Variance to waive the requirement for All SWLFs must cover the entire exposed 33 CSR 33 4.6.b.2.A<br />
dust controls cover with gre<strong>at</strong>er than 6 in. of compacted solid waste disposal area with a minimum<br />
cover m<strong>at</strong>erial <strong>at</strong> the end of each oper<strong>at</strong>ing thickness of 6 in. of compacted cover<br />
day.<br />
m<strong>at</strong>erial <strong>at</strong> the end of each oper<strong>at</strong>ing day.<br />
K-11