02.02.2013 Views

Coal Combustion Waste Management at - DOE - Fossil Energy ...

Coal Combustion Waste Management at - DOE - Fossil Energy ...

Coal Combustion Waste Management at - DOE - Fossil Energy ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE K.1 (Cont.)<br />

Variance<br />

Variance<br />

Regul<strong>at</strong>ion<br />

Regul<strong>at</strong>ion<br />

ID St<strong>at</strong>e Granted C<strong>at</strong>egory<br />

Description<br />

Summary<br />

Cit<strong>at</strong>ion<br />

209 WI Yes Liner Variance allowing a penetr<strong>at</strong>ion through All composite lined landfills shall be Wis. Adm. Code NR 504.06(5)(j)<br />

requirements the sideslope of the liner to accommod<strong>at</strong>e designed and constructed with sumps and<br />

gravity drain to the leach<strong>at</strong>e-collection sideslope risers as part of their leach<strong>at</strong>e<br />

tank.<br />

removal system, r<strong>at</strong>her than utilizing<br />

systems th<strong>at</strong> penetr<strong>at</strong>e the composite liner<br />

sidewall.<br />

205 WV Yes Cover/dust Variance to waive the requirement in the Solid waste fill surfaces exposed to we<strong>at</strong>her 33 CSR 4.6.b.2.B and<br />

controls regul<strong>at</strong>ions for 12 in. of compacted for periods in excess of 30 days must have 33 CSR 4.6.b.2.D.2<br />

intermedi<strong>at</strong>e cover m<strong>at</strong>erial on landfill a minimum of 12 in. of compacted cover<br />

areas exposed to we<strong>at</strong>her for periods in m<strong>at</strong>erial applied within 30 days of<br />

excess of 30 days.<br />

completion of the fill surface.<br />

204 WV Yes Cover/dust Variance to waive the requirement in the Solid waste fill surfaces th<strong>at</strong> remain 33 CSR 4.6.b.2.B<br />

controls regul<strong>at</strong>ions for 12 in. of compacted exposed to we<strong>at</strong>her for periods in excess of<br />

intermedi<strong>at</strong>e cover m<strong>at</strong>erial on landfill 30 days must have a minimum of 12 in. of<br />

areas exposed to we<strong>at</strong>her for periods in compacted cover m<strong>at</strong>erial applied within<br />

excess of 30 days.<br />

30 days of completion of the fill surface.<br />

205 WV Yes Daily cell Variance to waive the requirement th<strong>at</strong> Daily cell height must not exceed 8 ft in the 33 CSR 4.6.b.1.B<br />

height daily cell height must not exceed 8 ft in the vertical dimension, other than in the<br />

vertical dimension, other than in the middle, to divert storm w<strong>at</strong>er; th<strong>at</strong> vertical<br />

middle, where the vertical dimension can<br />

be as high as 11 ft to divert storm w<strong>at</strong>er.<br />

dimension must not exceed 11 ft.<br />

205 WV Yes Daily cover/ Variance to waive the requirement for Exposed solid waste disposal area must be 33 CSR 4.6.b.2.A and<br />

dust controls cover with gre<strong>at</strong>er than 6 in. of compacted covered with a minimum of 6 in. of 33 CSR 4.6.b.2.D.1<br />

cover m<strong>at</strong>erial <strong>at</strong> the end of each oper<strong>at</strong>ing compacted cover m<strong>at</strong>erial <strong>at</strong> the end of<br />

day.<br />

each oper<strong>at</strong>ing day, or more frequently as<br />

needed.<br />

204 WV Yes Daily cover/ Variance to waive the requirement for All SWLFs must cover the entire exposed 33 CSR 33 4.6.b.2.A<br />

dust controls cover with gre<strong>at</strong>er than 6 in. of compacted solid waste disposal area with a minimum<br />

cover m<strong>at</strong>erial <strong>at</strong> the end of each oper<strong>at</strong>ing thickness of 6 in. of compacted cover<br />

day.<br />

m<strong>at</strong>erial <strong>at</strong> the end of each oper<strong>at</strong>ing day.<br />

K-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!