02.02.2013 Views

Coal Combustion Waste Management at - DOE - Fossil Energy ...

Coal Combustion Waste Management at - DOE - Fossil Energy ...

Coal Combustion Waste Management at - DOE - Fossil Energy ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

TABLE K.1 (Cont.)<br />

Variance<br />

Variance<br />

Regul<strong>at</strong>ion<br />

Regul<strong>at</strong>ion<br />

ID St<strong>at</strong>e Granted C<strong>at</strong>egory<br />

Description<br />

Summary<br />

Cit<strong>at</strong>ion<br />

206 IL Yes Other Variance to allow piping th<strong>at</strong> does not The regul<strong>at</strong>ion establishes limiting-value 35 Ill. Adm. Code, Subtitle C,<br />

(standards for comply with the sewage works standards to criteria for the design and prepar<strong>at</strong>ion of Chapter II, Part 370<br />

sewage be installed.<br />

plans and specific<strong>at</strong>ions for wastew<strong>at</strong>er<br />

works)<br />

collection and tre<strong>at</strong>ment systems, to<br />

promote uniformity of practice throughout<br />

the St<strong>at</strong>e.<br />

226 IN Yes Closure/ Variance to allow use of ash, ash/soil Final compacted cover must have 6 in. of 329 IAC 10-30-2<br />

post-closure mixture, and 40-mil linear low-density topsoil plus 2 ft of compacted clay for<br />

requirements polyethylene (LLDPE) as final cover, slopes less than 15% or 3 ft of compacted<br />

r<strong>at</strong>her than compacted soil, as the<br />

regul<strong>at</strong>ions specify.<br />

clay for slopes gre<strong>at</strong>er than 15%.<br />

222 IN Yes Cover/dust Variance waiving intermedi<strong>at</strong>e cover Must apply and compact no less than 6 in.<br />

controls otherwise required by the regul<strong>at</strong>ions. of cover over all exposed solid waste<br />

monthly regardless of we<strong>at</strong>her conditions,<br />

or annually, if the solid waste can be<br />

demonstr<strong>at</strong>ed to have an in-place<br />

permeability of less than 1 × 10-6 329 IAC 10-28-12(b) (Type II);<br />

cm/s.<br />

329 IAC 10-36-12 (Type III)<br />

223 IN Yes Closure/ Variance allowing use of 2.5 ft of fine 329 IAC 10-37-2 requires 2 ft of soil as 329 IAC 10-37-2;<br />

post-closure sandy loam soils for the final cover, r<strong>at</strong>her described in 329 IAC 10-36-11, and 6 in. of 329 IAC 10-36-11;<br />

requirements than 2 ft of soil of Unified Soil<br />

veget<strong>at</strong>ive topsoil as required by 329 IAC 329 IAC 10-37-4(b)(4)<br />

Classific<strong>at</strong>ion ML, CL, MH, CH, or OH<br />

and 6 in. of veget<strong>at</strong>ive topsoil, as specified<br />

in the regul<strong>at</strong>ions.<br />

10-37-4.<br />

226 IN Yes Cover/dust Variance to allow use of Soil-Sement<br />

controls<br />

® , a Intermedi<strong>at</strong>e cover of not less than 1 ft of 329 IAC 10-28-12(a)(3)<br />

polymer-based m<strong>at</strong>erial, as an intermedi<strong>at</strong>e compacted clay-type soil must be applied<br />

cover, r<strong>at</strong>her than 1 ft of clay-type soil, as to any area within a Type I restricted waste<br />

the regul<strong>at</strong>ions specify.<br />

landfill th<strong>at</strong> has not received waste for<br />

90 days or more.<br />

K-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!