Figure 2: Radial variation of unconfined Figure 3: Unconfined compression<br />

tests<br />

strength in jet grout bulb on soil-cement cores<br />

Pile Load Tests<br />

Load tests were carried out on 457 mm diameter (18 inch) driven steel pipe piles at the<br />

Dunkirk site. The tests were load controlled with 15 to 20 increments applied with pause<br />

periods of at least 30 minutes between increments. The increment sizes were reduced and<br />

pause phases exten<strong>de</strong>d towards the end of the tests. Following this procedure, each load test<br />

took up to 24 hours to perform. Three main test series were performed.<br />

Capacity Increase from Jet Grouting<br />

Compression tests were carried out on two 10 m long piles. One pile had a nominally 3 m<br />

diameter 5 m high soil-cement bulb formed at the tip and the other was an untreated control<br />

pile. The piles were loa<strong>de</strong>d to failure in compression. The compressive pile capacity was<br />

doubled by the GOPAL treatment.<br />

Evolution of Shaft Resistance with Time<br />

There is consi<strong>de</strong>rable evi<strong>de</strong>nce that pile shaft capacity in sands increases with time (Chow et<br />

al., 1998). To continue this research, tension tests were performed on the GOPAL reaction<br />

piles. Tension tests were ma<strong>de</strong> on previously untested piles at 9 and 80 days and 7 months after<br />

installation. Combining this with previous data from the CLAROM study gives a total of 5<br />

tension tests on previously unfailed piles and 5 tension tests on piles which had been<br />

previously tested to failure.<br />

CONCLUSIONS<br />

The following conclusions can be drawn from the GOPAL field programme:<br />

• The feasibility of forming an artificial sandstone soil-cement bulb of up to 3 m diameter at<br />

the base of a driven steel pipe pile has been <strong>de</strong>monstrated.<br />

• Pile load tests have been performed on a 457 mm (18 inch) pile with a jet grout formed<br />

base and an i<strong>de</strong>ntical control pile.<br />