<strong>Zermatt</strong> Bergbahnen | <strong>Zermatt</strong> <strong>Magazin</strong> 83<br />
So the days of the “sardine tin cabins”<br />
are numbered?<br />
The “sardine tin cabins”, as you<br />
call them, with 100 people crammed<br />
into them, will be a thing of<br />
the past. The new S3 ropeway has<br />
25 gondolas with 28 seats and no<br />
standing, making it considerably<br />
more comfortable. We will be able<br />
to transport 2000 people every<br />
hour. With this capacity, we can<br />
transport guests to the almost<br />
4000 m high Klein Matterhorn in<br />
winter and summer in nine minutes<br />
and with no waiting time. It<br />
will also vastly improve the connection<br />
to Cervinia and guarantee that<br />
we can also transport foot passengers<br />
to the Matterhorn 365 days a<br />
year.<br />
52 million franc investment<br />
and clever logistics<br />
Is it fair to say that construction jobs<br />
of this scale in the mountains are not<br />
cheap and probably require special<br />
logistics?<br />
That’s true. The new 3S ropeway<br />
represents an investment of 52 million<br />
francs. The logistics are very<br />
challenging. With the exception of<br />
the valley station at Trockener Steg<br />
and masts 1 and 2, all the building<br />
materials are being delivered from<br />
Cervinia. 15 000 tons of materials<br />
have already been transported via<br />
the Furi – Trockener Steg cable car.<br />
The entire electro-mechanical<br />
parts, the actual ropeway system<br />
(stations, supports, cables), are<br />
being supplied by Leitner from Italy.<br />
A specially built transport<br />
ropeway from Cime Bianche Laghi<br />
via Testa Grigia to Klein Matterhorn<br />
makes this possible.<br />
How about the construction timetable?<br />
We started securing the rock in<br />
October 2015. The project is due<br />
to run until the end of September<br />
2018 and will go into operation<br />
in October 2018. We are in<br />
the construction phase. The current<br />
cable car from the 1980s – a<br />
pioneering achievement in its time<br />
– will not be taken down. It is currently<br />
being used to transport materials<br />
and will transport people<br />
while the new 3S ropeway is being<br />
inspected.<br />
So it will act as the mule of<br />
the Klein Matterhorn?<br />
If you like. With the existing cable<br />
car we can transport the necessary<br />
materials, the water for the restaurant<br />
and the fuel for the piste<br />
vehicles on the Klein Matterhorn.<br />
It was also an internal condition<br />
that the operation should continue<br />
to run uninterrupted for our guests<br />
while the 3S ropeway was under<br />
construction.<br />
The visionary forces of <strong>Zermatt</strong><br />
Bergbahnen, progressive thinkers<br />
and active executors, leave nothing<br />
to chance in the world health resort.<br />
The pioneers past and present<br />
know what they owe the next generation.<br />