<strong>Zermatt</strong> Bergbahnen | <strong>Zermatt</strong> <strong>Magazin</strong> 83<br />

So the days of the “sardine tin cabins”<br />

are numbered?<br />

The “sardine tin cabins”, as you<br />

call them, with 100 people crammed<br />

into them, will be a thing of<br />

the past. The new S3 ropeway has<br />

25 gondolas with 28 seats and no<br />

standing, making it considerably<br />

more comfortable. We will be able<br />

to transport 2000 people every<br />

hour. With this capacity, we can<br />

transport guests to the almost<br />

4000 m high Klein Matterhorn in<br />

winter and summer in nine minutes<br />

and with no waiting time. It<br />

will also vastly improve the connection<br />

to Cervinia and guarantee that<br />

we can also transport foot passengers<br />

to the Matterhorn 365 days a<br />

year.<br />

52 million franc investment<br />

and clever logistics<br />

Is it fair to say that construction jobs<br />

of this scale in the mountains are not<br />

cheap and probably require special<br />

logistics?<br />

That’s true. The new 3S ropeway<br />

represents an investment of 52 million<br />

francs. The logistics are very<br />

challenging. With the exception of<br />

the valley station at Trockener Steg<br />

and masts 1 and 2, all the building<br />

materials are being delivered from<br />

Cervinia. 15 000 tons of materials<br />

have already been transported via<br />

the Furi – Trockener Steg cable car.<br />

The entire electro-mechanical<br />

parts, the actual ropeway system<br />

(stations, supports, cables), are<br />

being supplied by Leitner from Italy.<br />

A specially built transport<br />

ropeway from Cime Bianche Laghi<br />

via Testa Grigia to Klein Matterhorn<br />

makes this possible.<br />

How about the construction timetable?<br />

We started securing the rock in<br />

October 2015. The project is due<br />

to run until the end of September<br />

2018 and will go into operation<br />

in October 2018. We are in<br />

the construction phase. The current<br />

cable car from the 1980s – a<br />

pioneering achievement in its time<br />

– will not be taken down. It is currently<br />

being used to transport materials<br />

and will transport people<br />

while the new 3S ropeway is being<br />

inspected.<br />

So it will act as the mule of<br />

the Klein Matterhorn?<br />

If you like. With the existing cable<br />

car we can transport the necessary<br />

materials, the water for the restaurant<br />

and the fuel for the piste<br />

vehicles on the Klein Matterhorn.<br />

It was also an internal condition<br />

that the operation should continue<br />

to run uninterrupted for our guests<br />

while the 3S ropeway was under<br />

construction.<br />

The visionary forces of <strong>Zermatt</strong><br />

Bergbahnen, progressive thinkers<br />

and active executors, leave nothing<br />

to chance in the world health resort.<br />

The pioneers past and present<br />

know what they owe the next generation.<br />