19.02.2013 Views

From: on behalf of Panel Registry Subject: FW: TNG registration of ...

From: on behalf of Panel Registry Subject: FW: TNG registration of ...

From: on behalf of Panel Registry Subject: FW: TNG registration of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Prosperity Mine Aquatic Impact Assessment prepared for<br />

MiningWatch Canada by Dr. David Levy, (2009). This report c<strong>on</strong>curs<br />

with the evaluati<strong>on</strong>s <strong>of</strong> the Taseko Mines proposal that were made<br />

by Dr. Levy (Mining Watch), and the DFO.<br />

After reviewing relevant secti<strong>on</strong>s <strong>of</strong> these documents I have<br />

c<strong>on</strong>cluded that if the mine is developed as indicated in the project<br />

documents, the project will have pr<strong>of</strong>ound and detrimental effect <strong>of</strong><br />

the Fish Lake/Little Fish Lake ecological system. Water movement<br />

and flow directi<strong>on</strong> would be drastically altered, the two lakes would<br />

be eliminated, and the land around the site <strong>of</strong> Fish Lake would be<br />

altered by mining facilities infrastructure.<br />

Substantive biological issues include; near total disrupti<strong>on</strong> <strong>of</strong><br />

the aquatic envir<strong>on</strong>ment, detrimental effects <strong>on</strong> fish producti<strong>on</strong> and<br />

sustainability. These impacts interface negatively with historically<br />

based use by indigenous people, current recreati<strong>on</strong>al potential, and<br />

esthetic qualities. All are important. In my view, the Taseko Mines<br />

proposal for compensati<strong>on</strong>s comes nowhere near making up for<br />

ecosystem loss and disrupti<strong>on</strong> that it would be caused if the mine is<br />

developed as planned.<br />

The Mine Plan – Ecosystem Changes<br />

The mine plan includes five important elements <strong>of</strong> watershed<br />

change as part <strong>of</strong> its development and operati<strong>on</strong>. The changes are:<br />

2<br />

• Change in directi<strong>on</strong> and locati<strong>on</strong> <strong>of</strong> water movement and<br />

flow by c<strong>on</strong>structi<strong>on</strong> <strong>of</strong> a 10.8 km Headwater Channel (HC)<br />

to the east <strong>of</strong> the present NW flowing Fish Creek system,<br />

• Creati<strong>on</strong> <strong>of</strong> a Headwater Channel Retenti<strong>on</strong> P<strong>on</strong>d (HCRP) for<br />

storage <strong>of</strong> collected water,<br />

• Creati<strong>on</strong> <strong>of</strong> an engineered spawning and rearing channel<br />

between the HCRP and a newly created ‘lake’ (Prosperity<br />

Lake),<br />

• Creati<strong>on</strong> <strong>of</strong>, Prosperity Lake, south <strong>of</strong> a 1.6 km. dyke that<br />

serves to c<strong>on</strong>tain the south end <strong>of</strong> the Tailings Storage<br />

Facility (TSF) “Lake”, and

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!