From: on behalf of Panel Registry Subject: FW: TNG registration of ...
From: on behalf of Panel Registry Subject: FW: TNG registration of ...
From: on behalf of Panel Registry Subject: FW: TNG registration of ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Increase<br />
Preservati<strong>on</strong> <strong>of</strong><br />
Wild and<br />
Cultivated Foods<br />
suitable to warmer climate and wildlife<br />
• Host workshops to educate and encourage<br />
Xeni Gwet’in members to start canning,<br />
drying and using root cellars<br />
Shelter and Infrastructure Protecti<strong>on</strong><br />
Adaptati<strong>on</strong><br />
Objective<br />
Protect Shelter<br />
and Infrastructure<br />
Reduce risk <strong>of</strong><br />
Mould, Mildew<br />
and Rot<br />
1<br />
Health Dept<br />
Short‐term<br />
Acti<strong>on</strong>s Priority Resp<strong>on</strong>sibility Timeframe Funding Required<br />
• See Health and Safety recommendati<strong>on</strong>s<br />
• C<strong>on</strong>tinue m<strong>on</strong>itor for mould, mildew and<br />
rot <strong>on</strong> a regular basis and apply housing<br />
renovati<strong>on</strong> funds where available<br />
• Educate householders about how to<br />
m<strong>on</strong>itor for mould, mildew and rot, how to<br />
ventilate their homes properly and how fix<br />
minor leaks<br />
• Examine the need to redesign new housing<br />
for wetter and milder winters (e.g. better<br />
ventilati<strong>on</strong> systems, better exterior<br />
drainage and wider ro<strong>of</strong> overhangs) (l<strong>on</strong>g‐<br />
term)<br />
Energy Supply Protecti<strong>on</strong>, C<strong>on</strong>servati<strong>on</strong> and Diversificati<strong>on</strong><br />
Adaptati<strong>on</strong><br />
Objective<br />
1<br />
2<br />
4<br />
Housing Dept<br />
Housing Dept<br />
Housing Dept<br />
Short‐term<br />
Short‐term<br />
Mid to L<strong>on</strong>g‐<br />
term<br />
Acti<strong>on</strong>s Priority Resp<strong>on</strong>sibility Timeframe Funding Required<br />
76