19.02.2013 Views

From: on behalf of Panel Registry Subject: FW: TNG registration of ...

From: on behalf of Panel Registry Subject: FW: TNG registration of ...

From: on behalf of Panel Registry Subject: FW: TNG registration of ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Protect Residents<br />

and Key Cultural<br />

Sites from Floods<br />

in the XGCA<br />

• Obtain a Structural Protecti<strong>on</strong> Unit capable <strong>of</strong><br />

deployment <strong>on</strong> up to three buildings at <strong>on</strong>ce.<br />

• Work with the appropriate agencies to<br />

upgrade existing airstrips located in the XGCA<br />

that have been identified to date (Chilko and<br />

Nemiah).<br />

• Fuel modificati<strong>on</strong> and other works identified<br />

should be carried out <strong>on</strong> the areas listed in<br />

Appendix 1.<br />

• Obtain appropriate insurance coverage for all<br />

Xeni Gwet’in homes and public assets<br />

• Ensure that appropriate partner agencies have<br />

a copy <strong>of</strong> the Community Wildfire Protecti<strong>on</strong><br />

Plan.<br />

• Coordinate FireSmart practices with resorts<br />

and residents in the area. Establish a fire<br />

safety committee for XGCA.<br />

• Cut Fire Breaks or reduce fuel loads around the<br />

key cultural sites outside Nemiah Valley.<br />

• Undertake road side thinning al<strong>on</strong>g the road<br />

from Nemiah through to the St<strong>on</strong>e reserve and<br />

from the north Chilko Lake through to the<br />

highway.<br />

• Salvage dead pine in high lightening strike<br />

areas <strong>of</strong>f reserve where feasible<br />

• Re‐introduce fire and identify areas where<br />

natural fires will be allowed to burn<br />

• Develop a Flood Protecti<strong>on</strong> Plan for high risk<br />

areas near homes, roads and cultural sites<br />

• C<strong>on</strong>tact Pacific Climate Impacts C<strong>on</strong>sortium to<br />

undertake hydrological modeling in area to<br />

determine l<strong>on</strong>g‐term flood risk in the area.<br />

• Ensure that appropriate partner agencies have<br />

a copy <strong>of</strong> the Flood Protecti<strong>on</strong> Plan.<br />

• M<strong>on</strong>itor key lake, river and stream levels<br />

• Acquire flood protecti<strong>on</strong> supplies and<br />

equipment from partnering agencies as<br />

needed.<br />

1<br />

1<br />

1<br />

1<br />

1<br />

2<br />

2<br />

3<br />

2<br />

2<br />

4<br />

3<br />

2<br />

3<br />

Council<br />

Fire Protecti<strong>on</strong><br />

Committee<br />

Fire Protecti<strong>on</strong><br />

Committee<br />

Council<br />

Council<br />

Fire Protecti<strong>on</strong><br />

Committee<br />

Fire Protecti<strong>on</strong><br />

Committee<br />

Fire Protecti<strong>on</strong><br />

Committee<br />

Fire Protecti<strong>on</strong><br />

Committee<br />

?<br />

Council/Science<br />

Committee<br />

Council<br />

Fish & Wildlife<br />

Committee<br />

Health Dept<br />

Short‐term<br />

Short‐term<br />

Short‐term<br />

Short‐term<br />

Short‐term<br />

Mid to L<strong>on</strong>g‐<br />

term<br />

Mid to L<strong>on</strong>g‐<br />

term<br />

Mid to L<strong>on</strong>g‐<br />

term<br />

Mid to L<strong>on</strong>g‐<br />

term<br />

Short‐term<br />

Mid‐term<br />

Short‐term<br />

Short‐term<br />

Mid‐term<br />

73

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!