03.03.2013 Views

Annual Report 2005-2006 - Waverley Council

Annual Report 2005-2006 - Waverley Council

Annual Report 2005-2006 - Waverley Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

154<br />

<strong>Waverley</strong> <strong>Council</strong><br />

Access and Equity Activities <strong>2005</strong>/<strong>2006</strong><br />

General (continued)<br />

Dept Page No<br />

Access routes to public transport in Bondi Junction. P&ES 157<br />

A plan was developed and implemented for improved pedestrian access to the Bondi Junction<br />

Interchange involving improved signposting and line marking both inside and around the interchange<br />

together with the installation of a pedestrian barrier fence on the eastern side of Grosvenor Street.<br />

Further works are likely to be necessary following the completion of the Bondi Junction Traffic &<br />

Transport Study.<br />

Deliver environmental workshops for <strong>Waverley</strong> residents. P&ES 162<br />

In the <strong>2005</strong>/<strong>2006</strong> reporting period, 5152 residents participated in environmental education programs,<br />

which is an increase from 2590 in 2004/<strong>2005</strong>. This rise in participation rates occurred across all<br />

areas of <strong>Council</strong>’s environmental education program, including community clean ups, workshops,<br />

energy and water saving retro-fit programs, festivals and school programs. It reflects the growth of<br />

<strong>Council</strong>s commitment to environmental education, which this year included the appointment of a<br />

new environmental education position to implement sustainable transport programs such as Walk to<br />

School initiatives and the <strong>Waverley</strong> Family Bike Fair.<br />

Non-structural (behavioural change) options to reduce car use. P&ES 167<br />

Car share was implemented in January <strong>2006</strong> and an evaluation was completed in June <strong>2006</strong>.<br />

Following the implementation of this pilot program, <strong>Council</strong> recruited a dedicated officer to develop<br />

and implement further sustainable transport behaviour change programs.<br />

Community satisfaction with public place amenity and public open PW&S 180<br />

space<br />

Baseline survey conducted with community indicating satisfactory degree of satisfaction with public<br />

place amenity.<br />

Number of streets with improved footpaths in Bondi Junction. PW&S 182<br />

Oxford Street West upgrade complete.<br />

Bondi Junction Technical Manual reviewed. PW&S 182<br />

Work is continuing on the preparation of the BJ Planning Review. The BJPR constitutes the<br />

preparation of a LEP, DCP and Public Domain Technical Manual for the BJ Commercial Centre and<br />

its surrounds. A workshop was held in March <strong>2006</strong> following the preparation of a draft Urban Profile.<br />

A Structure Plan is currently being prepared which will establish town-planning direction for the<br />

commercial centre and be the primary component of the second workshop, which is scheduled for<br />

August <strong>2006</strong>.<br />

Night time events in Oxford Street Mall to increase passive<br />

PW&S 182<br />

surveillance.<br />

Rock the Kasbah held in September <strong>2005</strong> and night-time market held December <strong>2005</strong>.<br />

Number of restaurants trading after 6pm in the Mall.<br />

Two Mall businesses trade regularly after 6pm.<br />

PW&S 182<br />

Directional signage to existing parking reviewed.<br />

Wayfinding strategy complete.<br />

PW&S 183<br />

Wayfinding Strategy complete.<br />

Project completed. Wayfinding strategy complete.<br />

PW&S 183<br />

Participate with C&TS in traffic impact study following Westfield PW&S 183<br />

opening.<br />

Participate with C&TS in traffic impact study following Westfield opening.<br />

Conduct Waste & Resource Recovery Survey. PW&S 188<br />

Waste & Resource Recovery The establishment of a Waste & Resource Recovery Customer<br />

Reference Panel has been delayed to await integration into a Sustainability Committee in<br />

September <strong>2006</strong>. This Sustainability Committee will meet quarterly to address all sustainability<br />

issues including waste management.<br />

<strong>Annual</strong> <strong>Report</strong> <strong>2005</strong>/<strong>2006</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!