Access and Equity Activities <strong>2005</strong>/<strong>2006</strong><br />
General (continued)<br />
Dept Page No<br />
Access routes to public transport in Bondi Junction. P&ES 157<br />
A plan was developed and implemented for improved pedestrian access to the Bondi Junction<br />
Interchange involving improved signposting and line marking both inside and around the interchange<br />
together with the installation of a pedestrian barrier fence on the eastern side of Grosvenor Street.<br />
Further works are likely to be necessary following the completion of the Bondi Junction Traffic &<br />
Transport Study.<br />
Deliver environmental workshops for <strong>Waverley</strong> residents. P&ES 162<br />
In the <strong>2005</strong>/<strong>2006</strong> reporting period, 5152 residents participated in environmental education programs,<br />
which is an increase from 2590 in 2004/<strong>2005</strong>. This rise in participation rates occurred across all<br />
areas of <strong>Council</strong>’s environmental education program, including community clean ups, workshops,<br />
energy and water saving retro-fit programs, festivals and school programs. It reflects the growth of<br />
<strong>Council</strong>s commitment to environmental education, which this year included the appointment of a<br />
new environmental education position to implement sustainable transport programs such as Walk to<br />
School initiatives and the <strong>Waverley</strong> Family Bike Fair.<br />
Non-structural (behavioural change) options to reduce car use. P&ES 167<br />
Car share was implemented in January <strong>2006</strong> and an evaluation was completed in June <strong>2006</strong>.<br />
Following the implementation of this pilot program, <strong>Council</strong> recruited a dedicated officer to develop<br />
and implement further sustainable transport behaviour change programs.<br />
Community satisfaction with public place amenity and public open PW&S 180<br />
space<br />
Baseline survey conducted with community indicating satisfactory degree of satisfaction with public<br />
place amenity.<br />
Number of streets with improved footpaths in Bondi Junction. PW&S 182<br />
Oxford Street West upgrade complete.<br />
Bondi Junction Technical Manual reviewed. PW&S 182<br />
Work is continuing on the preparation of the BJ Planning Review. The BJPR constitutes the<br />
preparation of a LEP, DCP and Public Domain Technical Manual for the BJ Commercial Centre and<br />
its surrounds. A workshop was held in March <strong>2006</strong> following the preparation of a draft Urban Profile.<br />
A Structure Plan is currently being prepared which will establish town-planning direction for the<br />
commercial centre and be the primary component of the second workshop, which is scheduled for<br />
August <strong>2006</strong>.<br />
Night time events in Oxford Street Mall to increase passive<br />
PW&S 182<br />
surveillance.<br />
Rock the Kasbah held in September <strong>2005</strong> and night-time market held December <strong>2005</strong>.<br />
Number of restaurants trading after 6pm in the Mall.<br />
Two Mall businesses trade regularly after 6pm.<br />
PW&S 182<br />
Directional signage to existing parking reviewed.<br />
Wayfinding strategy complete.<br />
PW&S 183<br />
Wayfinding Strategy complete.<br />
Project completed. Wayfinding strategy complete.<br />
PW&S 183<br />
Participate with C&TS in traffic impact study following Westfield PW&S 183<br />
opening.<br />
Participate with C&TS in traffic impact study following Westfield opening.<br />
Conduct Waste & Resource Recovery Survey. PW&S 188<br />
Waste & Resource Recovery The establishment of a Waste & Resource Recovery Customer<br />
Reference Panel has been delayed to await integration into a Sustainability Committee in<br />
September <strong>2006</strong>. This Sustainability Committee will meet quarterly to address all sustainability<br />
issues including waste management.<br />
<strong>Annual</strong> <strong>Report</strong> <strong>2005</strong>/<strong>2006</strong>