94<br />

<strong>Waverley</strong> <strong>Council</strong><br />

Meeting Our Statutory Requirements<br />

Condition of Public Works (continued)<br />

Footpaths<br />

Based on the PMS data. Over 25% of the footpath network meeds some form of reconstruction to<br />

improve pedestrian safety. Using a design life of approximately 20 years, funding of 5% of the asset<br />

value is needed each year to maintain the condition of our footpath assets.<br />

Drainage<br />

Using the information collected as part of <strong>Waverley</strong>’s AAS 27 evaluation, we have over 70km of<br />

drainage assets of which only 50% are in a good condition. Based on a conservative estimate, 1.5%<br />

of the asset value is needed each year to maintain these assets.<br />

Urban Roads<br />

Regional Roads<br />

Kerb and Gutter<br />

Footpath<br />

Drainage<br />

Condition as at<br />

June 30, 2002<br />

<strong>Annual</strong> <strong>Report</strong> <strong>2005</strong>//<strong>2006</strong><br />

Estimate of cost to bring<br />

to satisfactory standard<br />

(current $ value)<br />

Estimate of cost to<br />

maintain standard<br />

(current $ value)<br />

Pavement rehabilitation and<br />

resealing works required<br />

Pavement rehabilitation and<br />

10,160,000 960,000<br />

resealing works required<br />

Reconstruction and repairs<br />

955,000 90,000<br />

required to improve road<br />

profile.<br />

Upgrading works required to<br />

3,465,000 605,000<br />

improve pedestrian safety<br />

and reduce Public Liability<br />

exposure.<br />

Works required to repair pipe<br />

5,950,000 880,000<br />

network and improve<br />

capacity of system.<br />

40,500,000 1,980,000<br />

Maintenance Program<br />

<strong>2005</strong>/<strong>2006</strong><br />

Total<br />

Urban Roads Minor maintenance $228,408<br />

Concrete Roads $121,164<br />

Local Roads Re-sheeting $1,187,557<br />

Regional<br />

Roads Regional Roads Re-sheeting $8,047 $1,545,176<br />

Kerb and<br />

Gutter Minor Repairs $91,619<br />

Pram Ramps $3,761<br />

Construction $370,194 $485,574<br />

Footpath Minor Repairs $343,194<br />

Construction $2,688,358 $3,031,552