State of the Environment Activities <strong>2005</strong>/<strong>2006</strong><br />
Air<br />
Planned Activities Page No<br />
The draft Bondi Junction Comprehensive LEP will target land uses within the Bondi Junction<br />
Commercial Centre based on economic assessments undertaken as part of the development of the<br />
Urban Profile and Structure Plan preparation.<br />
In addition, the draft Bondi Junction Comprehensive LEP will incorporate the findings and<br />
recommendations of the Bondi Junction Heritage Assessment<br />
Reduced reliance on private car use in <strong>Waverley</strong>:<br />
136<br />
• Investigate the feasibility of mass transit options including<br />
light rail<br />
• <strong>Report</strong> to <strong>Council</strong> on alternative sustainable transport<br />
opportunities.<br />
Correspondence between <strong>Waverley</strong> <strong>Council</strong>, Sydney City and Canada Bay <strong>Council</strong> has taken place<br />
during the last quarter to develop an Inner Sydney Transport Working Group. A status report<br />
regarding the re-introduction of Light Rail is being prepared summarising what work has been<br />
undertaken by <strong>Waverley</strong> <strong>Council</strong> and outlining a proposed strategy for the future.<br />
Implementation of Transportation Policy:<br />
141,157<br />
• Investigate feasibility of Light Rail<br />
• Access routes to public transport in Bondi Junction<br />
• Develop Greenlinks<br />
• Car Share Program.<br />
Investigate feasibility of Light Rail<br />
Correspondence between <strong>Waverley</strong> <strong>Council</strong>, Sydney City and Canada Bay <strong>Council</strong> has taken place<br />
during the last quarter to develop an Inner Sydney Transport Working Group. A status report<br />
regarding the re-introduction of Light Rail is being prepared summarising what work has been<br />
undertaken by <strong>Waverley</strong> <strong>Council</strong> and outlining a proposed strategy for the future.<br />
Access routes to public transport in Bondi Junction<br />
A plan was developed and implemented for improved pedestrian access to the Bondi Junction<br />
Interchange involving improved signposting and line marking both inside and around the<br />
interchange together with the installation of a pedestrian barrier fence on the eastern side of<br />
Grosvenor Street.<br />
Further works are likely to be necessary following the completion of the Bondi Junction Traffic &<br />
Transport Study.<br />
Develop Greenlinks<br />
The Greenlink Strategy and Action Plan was formulated in October <strong>2005</strong>. <strong>Council</strong> adopted the<br />
Greenlinks <strong>Report</strong>, including the identification of Pilot Project 1, in June <strong>2006</strong>.<br />
Car Share Program<br />
Carshare was implemented in January <strong>2006</strong> and an evaluation was completed in June <strong>2006</strong>.<br />
Following the implementation of this pilot program, <strong>Council</strong> recruited a dedicated officer to develop<br />
and implement further sustainable transport behaviour change programs.<br />
Reduced reliance on private car use in <strong>Waverley</strong>. 151<br />
See below.<br />