HEP ANNUAL REPORT 2010<br />

CHAPTER 7 - REPORTS BY HEP GROUP COMPANIES WITH FINANCIAL STATEMENTS<br />

HEP-PROIZVODNJA d.o.o.<br />

NIKOLA RUKAVINA<br />

DIRECTOR<br />

THE EXCEPTIONAL BUSINESS RESULTS achieved by HEP Proizvodnja d.o.o. (HEP Production) in 2010 contributed to a<br />

record success of HEP Group business operations. Especially favourable hydrological conditions during the year made<br />

it possible for hydro power plants to achieve a record production in the amount of 8.3 TWh. It should be stressed<br />

that at the end of the year 2010 HEP Proizvodnja had high water levels in reservoirs of hydro power plants and high<br />

fuel levels in tanks for cogenerating plants. With the synchronization of Units A, B and C in August 2010 a period of<br />

trial operation of Lešće HPP began. In 2010, significant civil works were carried out for the needs of construction of<br />

Unit C of 230 MW at Sisak TPP.<br />

Due to the recession in most European countries, consumption of electricity and natural gas decreased, making<br />

natural gas supply in the European energy market sufficient and leading as a result to a decrease in electricity prices.<br />

Together with a record hydroelectric production in 2010 in Croatia, this made it possible to decrease production in<br />

less cost-competitive power plants fired by oil.<br />

It should be emphasized that HEP Proizvodnja continued in 2010 to maintain an appropriate high level of availability<br />

of generating plants and/or did not have any major failures or damages resulting in jeopardizing electricity<br />

or heat deliveries. Although most of HEP Proizvodnja production plants are aged, the cumulative investments in<br />

preventive maintenance and dedication by maintenance staff have ensured an appropriate condition of production<br />

plants.<br />

Along with fulfilling its core business of electricity and heat production and delivery to HEP systems and a<br />

high level of availability of generating plants, HEP Proizvodnja ensured the possibility of providing various auxiliary<br />

services for the needs of operating the Croatian electricity system within the European interconnected system. As<br />

in the previous six years, HEP Proizvodnja obtained certificates for 2010 of a hundred percent electricity production<br />

from renewable sources in hydro power plants. For several hydro power plants, ISO certificates 9000 and 14000<br />

were obtained. Professional improvement and training continued, depending on specific needs of different plants,<br />

production areas and headquarters of HEP Proizvodnja.<br />

Through regular maintenance, modernization and refurbishment, in 2010 the activities continued to improve<br />

control and management systems of power plants to make it capable of quickly changing loads and switching status<br />

as required by the system operator. The activities intensified on construction of the Cetina River Basin Center in order<br />

for HEP OPS, MC Split to take over the planning and control of power plants.<br />

In accordance with the Rules on Organization and Systematization of HEP Proizvodnja d.o.o. (2007) in 2009<br />

Economic Affairs Department and Department for Legal, Personnel and General Affairs were set up and in 2010<br />

Department for Production Planning was established.<br />

In 2010 the company successfully cooperated with HEP Group members, especially intensively with HEP OPS<br />

and HEP Trgovina considering the direct technological and economic interconnection. As part of the restructuring<br />

of the energy market according to EU requirements and Croatia’s pre-accession activities., HEP Proizvodnja specialists<br />

have been closely cooperating with specialists from other HEP Group members and with HERA, HROTE and the<br />

Ministry of the Economy, Labor and Entrepreneurship.<br />

Special attention is paid to the implementation of environmental legislation. A program to reduce CO 2 emissions<br />

has been prepared in accordance with Croatia’s obligations under the Kyoto protocol and other international<br />

documents. In 2010, most of the activities concerning the obtaining of environmental permits for thermal power<br />

and cogenerating plants were carried out.