162<br />

HEP ANNUAL REPORT 2010<br />

CHAPTER 7 - REPORTS BY HEP GROUP COMPANIES WITH FINANCIAL STATEMENTS<br />

HEP-TOPLINARSTVO d.o.o.<br />

ROBERT KRKLEC<br />

DIRECTOR<br />

IN 2010, HEP Toplinarstvo d.o.o. (HEP Heating) successfully carried out its activities of production, distribution and<br />

supply of heat energy as well as development and construction of the heating network in Zagreb, Osijek, Sisak,<br />

Velika Goprica, Samobor and Zaprešić. Despite harder business conditions, caused by the economic crisis as well as<br />

by inadequate heat selling prices, the company provided quality and reliable deliveries of heat energy and process<br />

steam for 116,534 household and 5,950 economic entities.<br />

As part of the Investment Plan, HEP Toplinarstvo continued the implementation of the existing investment<br />

projects and started new ones. Especially worth mentioning is the completion of the Hot Water Network Refurbishment<br />

Project in Zagreb and Osijek, financed by a World Bank loan and partly by our own funds. As part of this capital<br />

project, implemented from 2006 to 2010, 20 km of hot water network in Zagreb and 7.2 km of hot water network<br />

in Osijek were refurbished and 2.6 km of new hot water pipelines in Osijek were built. The refurbishment of the<br />

hot water network has been the largest work of its type ever since the network was originally constructed. The<br />

refurbished network increases the safety of the heating system, reduces distribution losses of heat energy as well<br />

as makeup service water, whereby large financial savings are achieved, number of emergency repair decreases,<br />

new technologies are adopted, armature handling is facilitated and its life is extended, network monitoring system<br />

is improved, and indirectly a positive environmental impact is achieved.<br />

In 2010, the construction was completed of new power facilities as part of the project of construction, operation<br />

and maintenance of the energy plant for Zagreb University Hospital at Rebro Hospital location. The project<br />

encompasses a complete supply to the hospital of all energy forms – heat energy, cooling energy, process steam<br />

and electricity.<br />

In addition to the above projects, the implementation of energy efficiency projects began in cooperation with<br />

HEP ESCO – the project to introduce gas to boiler G3 (the largest boiler plant in Velika Gorica, 20 MWt) and to build a<br />

connecting hot water pipeline between boiler plants G3 and G1, as well as the project of technological and economic<br />

optimization of the district heating system in Zagreb (TERMIS) system). The main objectives of these projects are more<br />

economical business operations, environmental protection and development of new technological solutions for the<br />

application of energy efficiency measures, in accordance with the strategic interests of the national energy policy.<br />

In spite of the utmost efforts of the Company, in 2010 again the biggest problem of our operations and development<br />

of the heating business was not solved – unrealistic ratio of prices of fuels needed to produce heat energy<br />

in cogenerating plants and separate boiler plants to selling prices of heat energy. The continuous growth of input<br />

costs has not been followed by appropriate change in selling prices and/or revenues from heat energy supplied,<br />

which is crucial for normal operations and development of the business.<br />

It must be also mentioned that the amendments to the Energy Act of October 2010 transfer decision making<br />

concerning change of amount of tariff items in the Tariff System for energy activities of heat energy production,<br />

distribution and supply to the level of representative bodies of local self government, which is very unfavorable for<br />

the heating activity. HEP Toplinarstvo experts have participated from the very beginning in legislative procedures vital<br />

for the reform of the energy sector in the area of heating, and we intend to continue to do so in the future.<br />

Finally, I believe that HEP Toplinarstvo through the organized, professional and dedicated work of its experts<br />

will successfully carry out the planned investment projects, new connections, maintenance work, make heating<br />

system improvement and meet the requirements facing the heating activity upon the coming into force of the new<br />

legislation as well as all other challenges that lie ahead in 2010, in spite of aggravated business conditions.