16.08.2013 Views

analysis of a pilot-scale anaerobic baffled reactor treating domestic ...

analysis of a pilot-scale anaerobic baffled reactor treating domestic ...

analysis of a pilot-scale anaerobic baffled reactor treating domestic ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METTHODS<br />

OFF<br />

SAMPLINNG<br />

AND ANNALYSIS<br />

This project spannned<br />

five yeaars<br />

<strong>of</strong> experiimentation.<br />

During D this ttime,<br />

many ppeople<br />

were involved inn<br />

samppling<br />

and anaalysis,<br />

and a nnumber<br />

<strong>of</strong> diifferent<br />

techn niques were used.<br />

1 S<br />

SAMPLING<br />

Sampples<br />

<strong>of</strong> inlet aand<br />

outlet cooncentrationss<br />

were obtain ned from thee<br />

feed splitterr<br />

box and the<br />

outlet pipee<br />

just bbefore<br />

treatedd<br />

effluent waas<br />

dischargedd<br />

back to the e wastewaterr<br />

channel. Duuring<br />

experim mentation att<br />

Umbiilo<br />

WWTP, samples were<br />

obtained from the sam mple valves supplied onn<br />

the side <strong>of</strong> f the <strong>reactor</strong>. .<br />

The iinitial<br />

100 mmℓ<br />

drawn froom<br />

each valvve<br />

was discarded<br />

and thhe<br />

subsequennt<br />

volume collected<br />

andd<br />

storedd<br />

for analysiis.<br />

The rrelative<br />

amouunts<br />

<strong>of</strong> sludgge<br />

and liquidd<br />

in each com mpartment wwere<br />

measureed<br />

using a sa ampling stickk<br />

or coore<br />

sampler (Figure A2.<br />

1). This coonsisted<br />

<strong>of</strong> a Perspex tuube<br />

with a 50<br />

mm intern nal diameter, ,<br />

calibrrated<br />

for height<br />

in metrees,<br />

and fitted with a rubber<br />

bung attached<br />

to a steeel<br />

rod. The rubber bungg<br />

and rrod<br />

was looseened<br />

from thhe<br />

outer tubee<br />

and dropped<br />

into the ABBR<br />

via the 775<br />

mm port on o the top <strong>of</strong>f<br />

the coompartment<br />

to be samplled.<br />

The Perspex<br />

rod wa as then droppped<br />

over the steel rod to o land on thee<br />

bung,<br />

capturing a core sampple<br />

that would<br />

be withdr rawn from tthe<br />

<strong>reactor</strong>. IInitial<br />

sludge<br />

and liquidd<br />

levelss<br />

were recordded.<br />

A 5 minn<br />

settling timme<br />

was allowe ed before setttled<br />

sludge llevels<br />

were measured. m<br />

Figurre<br />

A2. 1: CCore<br />

Sampleer<br />

filled withh<br />

compartm ment 1 sludgge<br />

(left) and compartme ent 8 sludgee<br />

aand<br />

supernattant<br />

(right)<br />

Durinng<br />

the Kingssburgh<br />

experrimentation,<br />

ssamples<br />

<strong>of</strong> compartment<br />

c<br />

contents weere<br />

not obtain ned from thee<br />

valvees<br />

on the sidee<br />

<strong>of</strong> the reacctor<br />

as it wass<br />

believed th hat conditionss<br />

near the wall<br />

<strong>of</strong> the rea actor did nott<br />

represent<br />

bulk coonditions.<br />

Coompartment<br />

samples wer re obtained uusing<br />

the corre<br />

sampler. Once O sludgee<br />

levelss<br />

had been reecorded,<br />

the core sampler<br />

was balanc ced in a buckket<br />

and the buung<br />

worked loose so thatt<br />

the core<br />

sample flushed out into the buccket.<br />

Bucket t contents wwere<br />

vigoroussly<br />

stirred an nd a samplee<br />

withddrawn<br />

for stoorage<br />

and anaalysis.<br />

185<br />

APPEN NDIX A22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!