Annual Report 2006-2007 - Gammon India
Annual Report 2006-2007 - Gammon India
Annual Report 2006-2007 - Gammon India
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
12<br />
T o p P r o j e c t s<br />
U n d e r E x e c u t i o n<br />
Name of the Project<br />
Client National Highway Authority of <strong>India</strong><br />
Project Profile Improvement, operation and maintenance of rehabilitation and strengthening of existing<br />
2 lane road and widening to 4 lane divided carriageway from km 539.500 to km 440.000<br />
Cost<br />
Name of the Project<br />
Client National Hydroelectric Power Corporation Limited<br />
Project Profile Construction of Part Head Race Tunnel, Surge Shaft, Pressure Shaft, Under Ground Power<br />
House and Tail Race Tunnel<br />
Cost<br />
Name of the Project<br />
Client Satluj Jal Vidhyut Nigam Limited<br />
Project Profile Construction of Civil Works for Head Race Tunnel inclusive cut & cover Section, River<br />
Diversion Works, Adits, Surge Shaft, Pressure Shafts, Valve House, Power House<br />
Complex, Tail Race Tunnel Adits And Hydro Mechanical Works<br />
Cost<br />
Name of the Project<br />
Client Government of West Bengal - PW road Directorate<br />
Project Profile State Highway & Rural Access Roads Component - Improvement of Gajol Hilli Section of<br />
SH-10 With a Link From Patiram to Balurghat Contract Package- D - SH-10 (97.428 km)<br />
Cost<br />
Name of the Project<br />
Client National Highway Authority of <strong>India</strong><br />
Project Profile Construction of new Bramhaputra Bridge near Guwahati on NH-31 in the State of Assam -<br />
Civil Package (AS-28)<br />
Cost<br />
VADAPE-GONDE ROAD (99.5KM) NH-3<br />
Rs. 621 crs.<br />
PARBATI HYDROELECTRIC PROJECT-LOT PB3<br />
Rs. 325 crs.<br />
RAMPUR HYDROELECTRIC PROJECT PACKAGE 1 & 2<br />
Rs. 403. 50 crs.<br />
WEST BENGAL CORRIDOR PROJECT<br />
Rs. 223 .09 crs.<br />
BRAMHAPUTRA BRIDGE<br />
Rs. 238. 40 crs.<br />
Parbati Tunnel