GAMMON INDIA LIMITED<br />

c. Dharmavaram – Tuni Annuity Road Project<br />

A Special Purpose Vehicle ‘Andhra Expressway Limited’ has been set up for development and maintenance<br />

of this project, which is a 47 km long road project that involves four laning of existing two lane project and<br />

strengthening of the same. Total cost of this project is about Rs. 248 Crores and the concession period<br />

is 17.5 years including 2.5 years of construction period. The project is well ahead of schedule and is<br />

operational since the last 3 years.<br />

d. New Mattancherry Bridge Project in Kerala<br />

The first BOT project in the state of Kerala this bridge connects Fort Kochi (the heritage town and a<br />

famous tourist place) to Willingdon island in Cochin Port Trust area and has completed 3 years of stable<br />

operations. This 700 meter long bridge provides a two-lane link across the Mattancherry Channel. The<br />

project has a concession period of 13 years and nine months, including 28 months of construction period.<br />

<strong>Gammon</strong>, with its civil engineering excellence, completed the construction in 18 months, i.e. 10 months<br />

ahead of schedule, which has resulted in early commencement of toll revenues. In addition to the tolls, the<br />

project company is also entitled to receive income in form of annuity from Government of Kerala.<br />

e. Rangit II Hydroelectric project in Sikkim<br />

This is a 40 year concession wherein the project company is developing a 60 MW hydro-power project in<br />

the north eastern <strong>India</strong>n state of Sikkim. The estimated project cost is about Rs. 350 crores.<br />

f. Mumbai-Nasik Expressway Project<br />

This Project is for the four laning of the Mumbai-Nasik section of National Highway 3 under the National<br />

Highways Development Project Phase III. This is amongst the most important gateways to connect Mumbai<br />

to northern, central & eastern part of <strong>India</strong>. It is the largest BOT road project in <strong>India</strong> with the total project<br />

cost estimated at over Rs. 750 Crores. The concession period for the project is 20 years including 3 years<br />

of construction. The project has achieved its Financial Closure and is currently under implementation.<br />

g. Bio-mass based Power project in Punjab<br />

<strong>Gammon</strong> has secured alongwith its 50% consortium partner a right to set up biomass fuel based power<br />

projects in the state of Punjab. Each of the projects would be in the range of approximately 12 MW each.<br />

Currently, it is in the process of setting the first 2 such projects through an SPV “Punjab Biomass Power<br />

Limited.” Each of these projects is expected to cost about Rs. 50 Crores. Land acquisition has already<br />

been completed & Financial Closure is underway. The construction is expected to begin shortly.<br />

h. Gorakhpur By-pass road project<br />

This project involves design, construction, finance, operation and maintenance of km 0.00 to km 32.27 of<br />

Gorakhpur Bypass on NH-28 in the State of Uttar Pradesh, <strong>India</strong> on Annuity Basis on behalf of the National<br />

Highways Authority of <strong>India</strong> (NHAI). The concession period is 20 years (including Construction Period of<br />

30 months). The project is presently under implementation.<br />

i. Kosi river bridge project<br />

The project involves design, construction, finance, operation and maintenance of 4-lane bridge across river<br />

Kosi including its approaches, and Guide Bund & Afflux Bund from km 155.00 to km 165.00 on NH-57 in the<br />

State of Bihar, <strong>India</strong> on Annuity Basis. The total length of the project stretch is 10.635 Km. The concession<br />

period is 20 years (including Construction Period of 3 years). The project is presently under implementation.<br />

j. Adityapur SEZ Project<br />

The consortium of <strong>Gammon</strong> alongwith Jamshedpur Utilities & Services Company Limited (JUSCO)<br />

(a TATA Group Company) has received the Letter of Intent for Development of Adityapur SEZ in Jharkhand<br />

from Adityapur Industrial Area Development Authority. The project involves design, construction, finance,<br />

operation and maintenance of SEZ Adityapur Limited. This SEZ will provide state of the art industrial<br />

infrastructure including utilities and logistic infrastructure and maintained by developers for 90 years. The<br />

project cost is Rs. 150 Crores.<br />

40