6.2.2 Reconnect a tube fitting<br />

You can disconnect and reconnect a tube fitting many times and still obtain a correct<br />

leak-proof seal. Refer to Figure 6-2 detail A which shows a tube fitting after you have<br />

disconnected it. Use the following procedure to reconnect it:<br />

1. Refer to detail B. Insert the tube (5) with the swaged ferrules (2, 3) into the tube fitting (1),<br />

until the front ferrule (2) is fully in the body of the fitting.<br />

2. Refer to detail C. Tighten the nut (4) by hand.<br />

3. Use a wrench or spanner to turn the nut (4) to its original position (you will feel an increase in<br />

resistance when the nut is in its original position), then tighten the nut slightly.<br />

6.3 Maintenance frequency<br />

The iH system requires little user maintenance. The maintenance operations you can carry<br />

out are described in the following sections. The frequency of maintenance operations<br />

depends on your process. Adjust the frequency of maintenance operations according to your<br />

experience.<br />

When you maintain the iH system, use BOC <strong>Edwards</strong> maintenance and service kits. These<br />

contain all of the necessary seals and other components necessary to complete maintenance<br />

operations successfully.<br />

6.4 Inspect the connections, pipelines, cables and fittings<br />

Note:<br />

Refer to Section 6.2 if you have to connect, disconnect or tighten Tube fittings.<br />

1. Remove the enclosure side and top panels: refer to Section 3.4.<br />

2. Check that all the cooling-water connections are secure; tighten any loose connections.<br />

Inspect all cooling-water pipelines, hoses and connections and check that they are not<br />

corroded or damaged and do not leak; repair or replace any pipelines, hoses and connections<br />

that are corroded or damaged, or which leak.<br />

3. Check that all the nitrogen connections are secure; tighten any loose connections. Inspect all<br />

nitrogen pipelines and connections and check that they are not corroded or damaged and do<br />

not leak; repair or replace any pipelines and connections that are corroded or damaged, or<br />

which leak.<br />

4. Check that all electrical connections are secure; tighten any loose connections. Inspect all<br />

electrical cables and connectors for damage; replace any cables and connectors that are<br />

damaged.<br />

5. Check that all process and exhaust connections are secure; tighten any loose connections.<br />

Inspect all process and exhaust pipelines and fittings and check that they are not corroded or<br />

damaged; replace any pipelines or fittings that are corroded or damaged.<br />

6. Refit the enclosure side and top panels: refer to Section 3.17.<br />

6-4 iH Dry Pumping Systems