Edwards IH Instruction Manual - Ideal Vacuum Products
Edwards IH Instruction Manual - Ideal Vacuum Products
Edwards IH Instruction Manual - Ideal Vacuum Products
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
3.2Installation checklist<br />
The operations required to install the iH system and the sections of this instruction manual<br />
which describe those operations are shown in Table 3-1.<br />
Installation operation<br />
Section<br />
Unpack and inspect 3.3<br />
Remove the enclosure panels 3.4<br />
Reconfigure the nitrogen and water connections (if required) 3.5<br />
Locate the iH system 3.6<br />
Check the pump oil-level(s) 3.7<br />
iH80 systems 3.7.1<br />
iH600/iH1000 systems 3.7.2<br />
Install or replace the Pump Display Terminal and optional accessories<br />
3.8<br />
(if necessary)<br />
Install the Pump Display Terminal 3.8.1<br />
Install optional accessories 3.8.2<br />
Connect the iH inlet to your vacuum system 3.9<br />
Connect the iH exhaust outlet to your exhaust extraction system 3.10<br />
Connect to your factory extraction system (optional) 3.11<br />
Connect the nitrogen supply 3.12<br />
Leak test the system 3.13<br />
Install additional safety equipment (optional) 3.14<br />
Connect to your emergency stop circuit (optional) 3.15<br />
Electrical supply and RF earth (ground) connections 3.16<br />
Reconfigure the iH system for your electrical supply (if necessary) 3.16.1<br />
Reconfigure the pump(s) for your electrical supply (if necessary) 3.16.2<br />
Connect the electrical supply to the iH system 3.16.3<br />
Connect an additional RF earth (optional) 3.16.4<br />
Refit the enclosure panels 3.17<br />
Connect the cooling-water pipelines 3.18<br />
Adjust the interstage purge flow rates if necessary 3.19<br />
Commission the iH system 3.20<br />
Switch on an iH80/iH1000 system 3.20.1<br />
Configure and switch on an iH600 system 3.20.2<br />
Install Disconnect Box (accessory) 3.21<br />
Unpack and Inspect 3.21.1<br />
Table 3-1 - Installation checklist<br />
3-2 iH Dry Pumping Systems