VILLAGE OF HUNTLEY<br />

WATER CAPITAL DEVELOPMENT FUND<br />

Overview<br />

The Water <strong>Capital</strong> Development Fund was established for engineering <strong>and</strong> construction<br />

costs for improvements to the <strong>Village</strong>’s water facilities <strong>and</strong> for major equipment<br />

purchases to support <strong>Village</strong> water operations. The vast majority <strong>of</strong> the <strong>Village</strong>’s water<br />

infrastructure projects over the last ten (10) years have been funded by developer<br />

commitments. Projects <strong>and</strong> equipment purchases for <strong>2009</strong> total $834,750 <strong>and</strong> include:<br />

• The required set aside <strong>of</strong> funds in the amount <strong>of</strong> $690,000 for future Route 47<br />

water infrastructure improvements associated with the Route 47 widening<br />

project.<br />

• The relocation <strong>of</strong> the generator from the West Wastewater Treatment Plant to<br />

Well No. 10 which would then give the <strong>Village</strong> four wells with emergency<br />

backup power supply.<br />

• Replacement <strong>of</strong> the waste pit pumps at Well No. 7.<br />

• A front end loader to be shared by all divisions in the department.<br />

• SCADA system improvements for technological advancement. The<br />

improvements will increase the system’s reporting ability <strong>and</strong> meet the changing<br />

system requirements.<br />