All indications are that the downturn in the housing market will continue through at least the<br />
end <strong>of</strong> <strong>2009</strong>. With this in mind, the <strong>Village</strong> is projecting a $300,000 or 37.5% decrease in <strong>2009</strong><br />
building permit income.<br />
In addition, the lowering <strong>of</strong> interest rates over the last several months has lowered<br />
investment income projections from 2008 to <strong>2009</strong> by $200,000 or 40%.<br />
Due to the economic turmoil <strong>and</strong> uncertainty facing the <strong>Village</strong>, several major adjustments<br />
were made to the General <strong>Operating</strong> Fund expenditures from 2008 to <strong>2009</strong> to reduce<br />
operational costs. A summary <strong>of</strong> the cost cutting proposals are below:<br />
1) Personnel services costs were reduced approximately $200,000 by deferring the hiring<br />
<strong>of</strong> vacant positions until later in the year <strong>and</strong> other adjustments.<br />
2) Legal fees were reduced by $120,000 due to no longer needing the services <strong>of</strong> special<br />
legal counsel in the ComEd Northwest Reliability case.<br />
3) Contract janitorial services for the Municipal Complex were eliminated with an<br />
estimated savings <strong>of</strong> approximately $50,000.<br />
4) Contract l<strong>and</strong>scaping <strong>and</strong> snow removal services for the Municipal Complex were<br />
eliminated with an estimated savings <strong>of</strong> approximately $15,000.<br />
5) With the restructuring <strong>of</strong> Economic Development duties in-house, the Economic<br />
Development budget was reduced by $15,000.<br />
6) The use <strong>of</strong> outside consultants in the Development Services <strong>and</strong> Engineering<br />
Departments was reduced with an estimated savings <strong>of</strong> $120,000.<br />
These proposed adjustments total approximately $520,000.<br />