VILLAGE OF HUNTLEY<br />
Performance Indicators<br />
Public Works Department – Streets & Underground Utilities<br />
2004 2005 2006 2007 2008*<br />
Miles <strong>of</strong> Maintained Road 122<br />
Tons <strong>of</strong> Salt Used 1,173 1,835 1,076 3,223 1,644<br />
Plowing Events (man hours) 1,033 1,522 797 2,923 2,200<br />
Asphalt Used<br />
215 tons<br />
Concrete Poured<br />
86 yards<br />
Water Main Pipe Installed<br />
320 feet<br />
Sanitary Pipe Installed<br />
97 feet<br />
Street Light Work<br />
132<br />
Orders (2-3 lights per order)<br />
Fire Hydrants Replaced 2<br />
Water Main Break<br />
6<br />
Repairs<br />
Water Main Valves<br />
7<br />
Installed<br />
J.U.L.I.E. Locates<br />
Performed<br />
6,770 6,532 6,116 5,149 3,406<br />
*Through October<br />