VILLAGE OF HUNTLEY<br />

Performance Indicators<br />

Public Works Department – Streets & Underground Utilities<br />

2004 2005 2006 2007 2008*<br />

Miles <strong>of</strong> Maintained Road 122<br />

Tons <strong>of</strong> Salt Used 1,173 1,835 1,076 3,223 1,644<br />

Plowing Events (man hours) 1,033 1,522 797 2,923 2,200<br />

Asphalt Used<br />

215 tons<br />

Concrete Poured<br />

86 yards<br />

Water Main Pipe Installed<br />

320 feet<br />

Sanitary Pipe Installed<br />

97 feet<br />

Street Light Work<br />

132<br />

Orders (2-3 lights per order)<br />

Fire Hydrants Replaced 2<br />

Water Main Break<br />

6<br />

Repairs<br />

Water Main Valves<br />

7<br />

Installed<br />

J.U.L.I.E. Locates<br />

Performed<br />

6,770 6,532 6,116 5,149 3,406<br />

*Through October<br />

81