NewTom VG User Manual rev 4.0 - Image Works
NewTom VG User Manual rev 4.0 - Image Works
NewTom VG User Manual rev 4.0 - Image Works
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Preliminary procedures<br />
5 Preliminary procedures<br />
This chapter describes the procedures to perform compulsorily before starting scanning patients.<br />
These procedures are three:<br />
• X-Ray source conditioning;<br />
• Daily check;<br />
• Blank acquisition;<br />
This chapter describes also some required and/or useful functions:<br />
• Beam limiter test<br />
• Completely lift down the rotating arm<br />
X-Ray source conditioning and Blank acquisition must be performed every two weeks (14 days), while Daily<br />
check is mandatory every day, before patients acquisitions.<br />
If these procedures are not performed the software will disable the scan functions.<br />
Operating modes are described in detail in the same named chapter from the "Software <strong>Manual</strong>".<br />
5.1 X-Ray source conditioning<br />
The conditioning procedure is needed to prepare the x-ray source for its routine working.<br />
The software asks to perform it every two weeks. It is suggested to perform the conditioning also if the<br />
device does not operate for days.<br />
REMOVE<br />
Before starting the procedure, please verify that the<br />
scan area is completely free from objects.<br />
Remove the head support.<br />
At the end of conditioning process, the software will automatically starts Daily check and Blank acquisition<br />
procedures.<br />
5.2 Daily Check<br />
By mean of the Daily Check procedure the system verifies that each every part of itself properly works.<br />
Rev. 1.0 - 02/15/2009 Page 28 of 72