25.04.2014 Views

School's Report 2012 National Senior Certificate (NSC) Examination

School's Report 2012 National Senior Certificate (NSC) Examination

School's Report 2012 National Senior Certificate (NSC) Examination

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SCHOOL’S REPORT <strong>2012</strong> NATIONAL SENIOR CERTIFICATE (<strong>NSC</strong>) EXAMINATION<br />

3.8.8 Electrification<br />

The current reports indicate that there are 540 schools without electricity in the province. The fact that<br />

the other 5400 schools have electricity is a testimony to the department’s commitment to improving<br />

the quality of the education. The electrification programme continues to be rolled-out with assistance<br />

from the Department of Energy. In <strong>2012</strong>/13 alone 34 schools have been fitted with solar panels. By<br />

the end of the financial year an additional 20 schools will be completed. The projection is that by<br />

2014 all schools in the province will have electricity. Provision and maintenance of solar electrical<br />

systems by the department is receiving attention. However the rampant vandalism of the panels and<br />

battery storage is an area of concern that requires consolidated input of all role players.<br />

3.8.9 Infrastructure: Early Childhood Development (ECD)<br />

Over and above the inclusion of ECD classrooms with all the new primary schools, there is a<br />

dedicated programme for the provisioning and supplying of ECD facilities. The department is busy<br />

with 669 classrooms and 2294 toilets seats for ECD over the current MTEF periods which are either<br />

at various stages of planning or construction, with 157 completed during the current financial year.<br />

It is envisaged that the target of 300 ECD classrooms will easily be met by the end of the current<br />

financial year.<br />

3.8.10 Infrastructure: Education for Learners with Special Education Needs (ELSEN)<br />

and Full Service Schools (FSS)<br />

A dedicated programme totalling 177 schools (ELSEN or FSS) has 96 and 46 projects at various<br />

stages of planning and construction concurrently. Six (6) of the projects are large in nature with<br />

the provision of hostel accommodation and dining halls in addition to the specialist and general<br />

infrastructure accommodation requirements for ELSEN schools. The balance of the projects includes<br />

the building of support centres, addressing accessibility ramps, and general repairs and renovations.<br />

During this financial year, 17 projects have been completed.<br />

3.8.11 Sports Fields<br />

All new schools are designed with the provision of sporting facilities. A sports field and normally 2<br />

netball courts are being provided as the basic provisioning of sporting facilities. These facilities have<br />

also been incorporated with the planning of the Upgrades and Additions programme where space is<br />

available within the school sites.<br />

The Department is an active participant in the Infrastructure Development Improvement Programme<br />

(IDIP) which is funded by <strong>National</strong> Treasury. It aims to institutionalize forward planning and adoption<br />

of best practices as espoused by Construction Industry Development Board (CIDB). The IDIP<br />

technical assistant is resident in the province and is attached to the Chief Directorate: Infrastructure<br />

Planning and Delivery Management. The role of the Technical Assistant is to interact with all levels<br />

of administration in the Department.<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!