<strong>July</strong> 26, 2011<br />

b. Report of the Chief Operating Officer<br />

Mr. Gil Quiniones echoed the remarks made to President Kessel and thanked him for the work he has<br />

done on behalf of the <strong>Authority</strong>. He then provided highlights of the report to the Trustees. He said that the<br />

<strong>Authority</strong>'s net generation and its transmission availability has increased; the audit related to the North<br />

American Electric Reliability Corporation’s (“NERC”) requirements continues to go well and the Life Extension<br />

and Modernization (“LEM”) of the <strong>Authority</strong>'s hydroelectric assets are also going well – the LEM of Unit 24 at<br />

the St. Lawrence project has been completed and the work on Unit 19 has been deferred. He ended by saying<br />

that the <strong>Authority</strong>’s business assets are doing well.<br />