NYISO Capacity Requirements Matters<br />

The installed capacity (‘‘ICAP’’) market in <strong>New</strong> <strong>York</strong> was created administratively to ensure the<br />

reliability of the electricity system. The Reliability Council annually sets <strong>New</strong> <strong>York</strong> State’s minimum capacity<br />

requirement which is currently 115.5% of the State’s peak load, and the NYISO has set the current <strong>New</strong> <strong>York</strong><br />

City and Long Island locational ICAP requirements at 81% and 101.5% of their peak load levels,<br />

respectively. The <strong>New</strong> <strong>York</strong> City and Long Island ICAP requirements must be met with resources located<br />

within those areas, while the ICAP quantities above these locational ICAP requirement levels up to the<br />

minimum 115.5% level can be procured from anywhere in <strong>New</strong> <strong>York</strong> State and from external resources.<br />

The requirements are allocated among LSEs in proportion to the load they serve.<br />

These capacity requirements must be met monthly for two capability periods: a summer period<br />

extending from May to October and a winter period ranging from November to April. The NYISO<br />

currently conducts auctions for each capability period (also known as ‘‘strip auctions’’), as well as monthly<br />

auctions to account for load-shifting and to resolve deficiencies. LSEs may meet their capacity<br />

requirements by self-supplying the capacity from their own resources, or with capacity acquired through<br />

bilateral contracts, or by purchasing the capacity through the auctions conducted by the NYISO. A<br />

deficiency price is imposed on any LSE that does not meet its capacity requirement.<br />

The NYISO employs an ICAP demand curve which provides payments to ICAP providers for ICAP<br />

above the minimum level required for reliability in order to encourage the construction of new generating<br />

facilities in <strong>New</strong> <strong>York</strong>. Generally, these provisions have increased the amount of ICAP an LSE will be<br />

obligated to obtain to meet NYISO requirements, including separate requirements applicable for <strong>New</strong> <strong>York</strong><br />

City and Long Island. The <strong>Authority</strong> has been able, as an LSE, to meet these revised requirements through its<br />

own units, contracts with other generators, and purchases in the capacity markets, and expects to be able to<br />

do so in the future.<br />