needs at any point in time. Unless governed by a bilateral arrangement, the price a generator is paid and the<br />

price paid to the NYISO by an LSE purchasing energy is dependent upon the results of the bidding process<br />

and system conditions (for a discussion of certain NYISO rules having an impact on the bidding<br />

procedures, see ‘‘NYISO Mitigation Measures’’ below). A significant feature of the NYISO energy markets<br />

is that prices are determined on a location-specific basis taking into account local generating bids submitted<br />

and the effect of transmission congestion and electrical losses between regions of <strong>New</strong> <strong>York</strong> State.<br />

The <strong>Authority</strong>, being an LSE and a generator, may choose to meet its LSE load requirements by a<br />

combination of (1) bilateral arrangements, which, in the <strong>Authority</strong>’s case, would mean specified <strong>Authority</strong><br />

generation and purchased energy under contractual arrangements, linked to specified <strong>Authority</strong> loads, and<br />

(2) purchases in the DAM or the real time market. The <strong>Authority</strong>’s ownership of certain transmissionrelated<br />

rights serves to reduce uncertainty concerning congestion costs to the <strong>Authority</strong> of such bilateral<br />

arrangements and energy market transactions.<br />

Certain <strong>Authority</strong> Plant Outage Risks<br />

The NYISO administers the DAM and the real time market through which suppliers and purchasers of<br />

energy and ancillary services can sell and acquire such products. The <strong>Authority</strong> participates in these<br />

markets as both a buyer and a seller of electricity and ancillary services.<br />

Because of NYISO installed capacity reserve requirements, the <strong>Authority</strong> is required to bid into the<br />

DAM virtually all of the installed capacity of its units. The NYISO then decides which <strong>Authority</strong> units will be<br />

dispatched, if any, and how much of such unit’s generation will be dispatched. The dispatch of a<br />

particular unit’s generation depends upon the bid prices for the unit submitted by the <strong>Authority</strong>, bids<br />

submitted by other generators, the amount of generation needed by the NYISO to meet expected demand and<br />

transmission limitations. If an <strong>Authority</strong> unit is dispatched by the NYISO, the <strong>Authority</strong> receives a fixed price<br />

for each hour (the ‘‘Market Clearing Price’’), based on NYISO pricing methodology, for the energy dispatched<br />

above that designated by the <strong>Authority</strong> as bilateral arrangement generation (the ‘‘Excess Energy’’). As to<br />

the bilateral arrangement generation (the ‘‘Contract Energy’’), the <strong>Authority</strong> receives the price in its contracts<br />

with its customers (the ‘‘Contract Price’’).<br />

This procedure has provided the <strong>Authority</strong> with economic benefits from its units’ operation when<br />

selected by the NYISO and may do so in the future. However, such selections in the DAM also obligate the<br />

<strong>Authority</strong> to supply the energy in question during a specified time period, which does not exceed two days<br />

(the ‘‘Short-Term Period’’), if the unit is selected. If a forced outage occurs at the <strong>Authority</strong> plant which is<br />

to supply such energy, then the <strong>Authority</strong> is obligated to pay during the Short Term Period (1) in regard to<br />

the Excess Energy amount, the difference between the price of energy in the NYISO real time market and<br />

the Market Clearing Price in the DAM, and (2) in regard to the Contract Energy amount, the price of<br />

energy in the NYISO real time market which is offset by the Contract Price. This real time market price may<br />

be subject to more volatility than the DAM price. The risk attendant with this outage situation is that, under<br />

certain circumstances, the Market Clearing Price in the DAM and the Contract Price may be well below the<br />

price in the NYISO real time market, with the <strong>Authority</strong> having to pay the difference. In times of maximum<br />

energy usage, this cost could be substantial. This outage cost risk is primarily of concern to the <strong>Authority</strong> in<br />

the case of its 500-MW Plant because of its size, nature, and location.<br />

In addition to the risk associated with <strong>Authority</strong> generation bids into the DAM, the <strong>Authority</strong> could incur<br />

substantial costs in times of maximum energy usage in purchasing replacement energy for its customers<br />

in the DAM or through other supply arrangements to make up for lost energy due to an extended outage<br />

of its units and non-performance of counterparties to energy supply contracts.<br />

As part of an ongoing risk mitigation program, the <strong>Authority</strong> implements financial hedging<br />

2-13