20091231-0037 FERC PDF (Unofficia1) 12/29/2009<br />

Direct Testimony of Charles A. White<br />

Docket ERIO-~-OOO<br />

Page 5 of 17<br />

Exhibit<br />

No. SCE-6<br />

Order directed the GridSouth Sponsors (I) to re-file certain documents with limited<br />

2 changes as reflected in the Order; (2) to meet with representatives of the South Carolina<br />

3 Public Service Authority ("Santee Cooper") to attempt to reach agreement on Santee<br />

4 Cooper's participation in the GridSouth RTO; and (3) to have discussions with other<br />

5 transmission owners in the southeast to explore expansion ofGridSouth's geographic<br />

6 scope. In accordance with FERC's March 14th Order, the GridSouth Sponsors<br />

7 commenced extensive discussions with Santee Cooper and other transmission owners in<br />

8 the southeast. The meetings with Santee Cooper over the next three months were<br />

9 numerous and very comprehensive. The GridSouth Sponsors also had discussions with<br />

10 Southern Company, Georgia <strong>Transmission</strong> Corporation, Southeastern Power<br />

11 Administration and Tennessee Valley Authority.<br />

12 On May 14, 2001, GridSouth made a compliance filing with the FERC as required by the<br />

13 FERC's March 14th order. The filing contained revisions to the <strong>OATT</strong>, Operating<br />

14 Agreement and LLC Agreement addressing the specific issues identified in the FERC's<br />

15 March 14th order and a status report on GridSouth' s efforts to expand its scope in the<br />

16 southeast region. In addition, GridSouth' s Generator Interconnection Procedures,<br />

17 congestion management procedures, a Reliability Operating Agreement between<br />

18 GridSouth and each of Duke, CP&L and SCE&G, and Master Definition List were filed<br />

19 with the FERC.<br />

20 On July 12,2001, the FERC issued two orders affecting GridSouth. In one of the orders,<br />

21 which addressed GridSouth's compliance filing, the Commission recognized "the<br />

22 considerable efforts of Applicants to meet with other transmission owners in the region.